Store the shipping brackets if you want to move your system at a later date.
2.
Cable the server.
a.
Plug the two power cords into the power supplies (A) and attach the cables to the handles on the
power supply using cable ties or hook-and-loop fasteners (B).
b.
Connect the system power cords from the server and I/O drawers to the PDU with an IEC 320
type receptacle.
c.
Attach the PDU input power cord and plug it into the power source.
P8EG1510-1
Figure 37. Removing the shipping brackets from the rear of the chassis
Figure 38. Plugging the power cords into the power supply and attaching cables to the power supply handles
Installing the IBM Power System S822L (8247-22L)
39
Summary of Contents for S822L
Page 1: ...Power Systems Installing the IBM Power System S822L 8247 22L GI11 9908 06 IBM...
Page 2: ......
Page 3: ...Power Systems Installing the IBM Power System S822L 8247 22L GI11 9908 06 IBM...
Page 16: ...xiv Power Systems Installing the IBM Power System S822L 8247 22L...
Page 62: ...46 Power Systems Installing the IBM Power System S822L 8247 22L...
Page 74: ...58 Power Systems Installing the IBM Power System S822L 8247 22L...
Page 75: ......
Page 76: ...IBM Part Number 01LK526 Printed in USA GI11 9908 06 1P P N 01LK526...