Continue with step 21.
21.
Secure the TIM and heat sink to the processor socket.
a.
Ensure that the heat sink load arms are engaged as shown by (A) in Figure 140.
b.
Tighten the center load screw clockwise by using the supplied hex key as shown by (B) in
Figure 140 until a firm stop is reached. If the heat sink moves noticeably, the load arms are not
engaged. Unscrew the center load screw and repeat this step again.
Figure 139. Installing the heat sink on the gray-colored TIM
Figure 140. Tightening the center load screw on the heat sink
Removing and replacing parts in the IBM Power System S822LC (8335-GTB)
119
Summary of Contents for S822LC
Page 1: ...Power Systems Servicing the IBM Power System S822LC 8335 GTB IBM ...
Page 2: ......
Page 3: ...Power Systems Servicing the IBM Power System S822LC 8335 GTB IBM ...
Page 16: ...xiv Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 204: ...188 Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 242: ...226 Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 243: ......
Page 244: ...IBM ...