Now continue with the removal steps.
7.
Open the hook-and-loop fastener on the cold plate installation carrier as shown in Figure 11 on page
9. It holds the water hoses.
Figure 9. The cold plate holder slots and the cold plate pins. Each plastic holder has two slots to secure the two pins
that are on the top of each cold plate. (A) First secure one pin to the holder, then (B) rotate the holder to secure the
second pin. In (C) both pins are secured to the holder.
Figure 10. Fastening the water hoses to the carrier. The carrier has a hook-and-loop fastener to hold the water hoses
when you are moving the entire cold plate assembly and carrier.
8
Power Systems: Servicing the IBM Power System S822LC (8335-GTB)
Summary of Contents for S822LC
Page 1: ...Power Systems Servicing the IBM Power System S822LC 8335 GTB IBM ...
Page 2: ......
Page 3: ...Power Systems Servicing the IBM Power System S822LC 8335 GTB IBM ...
Page 16: ...xiv Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 204: ...188 Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 242: ...226 Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 243: ......
Page 244: ...IBM ...