12.
Repeat from step 10 on page 11 for each cold plate.
13.
After all the cold plates are attached to the cold plate installation carrier, lift the carrier straight up
off the system as shown in Figure 20 on page 16. If you lift at an angle, the carrier catches on the
cold plate clips.
Figure 19. Replacing the holder back onto the carrier
Removing and replacing parts in the IBM Power System S822LC (8335-GTB)
15
Summary of Contents for S822LC
Page 1: ...Power Systems Servicing the IBM Power System S822LC 8335 GTB IBM ...
Page 2: ......
Page 3: ...Power Systems Servicing the IBM Power System S822LC 8335 GTB IBM ...
Page 16: ...xiv Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 204: ...188 Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 242: ...226 Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 243: ......
Page 244: ...IBM ...