17.
Use this step to install a new silver-colored TIM and heat sink.
a.
Open the TIM packaging and carefully remove the TIM, holding it by the edges of the carrier
strip and holding it away from the shipping container.
b.
Remove the protective film from the clear carrier strip by using the supplied tweezers.
Note:
The TIM must remain flat. Small wrinkles are acceptable, but folds are not acceptable.
c.
Using the tweezers, remove the TIM from the carrier strip and center it onto the system processor
module. The silver-colored TIM must have the red stripe up. Align the beveled edges of the
silver-colored TIM and the system processor module (A), as shown in Figure 133.
d.
Place the new heat sink on the TIM as shown in Figure 134 on page 115.
Figure 133. Installing the silver-colored TIM onto the processor. The red stripe must be up.
114
Power Systems: Servicing the IBM Power System S822LC (8335-GTB)
Summary of Contents for S822LC
Page 1: ...Power Systems Servicing the IBM Power System S822LC 8335 GTB IBM ...
Page 2: ......
Page 3: ...Power Systems Servicing the IBM Power System S822LC 8335 GTB IBM ...
Page 16: ...xiv Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 204: ...188 Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 242: ...226 Power Systems Servicing the IBM Power System S822LC 8335 GTB ...
Page 243: ......
Page 244: ...IBM ...