2.
Extend the slide rails forward (1) until they click into place twice. Carefully lift the server and tilt it
into position over the slide rails so that the rear nail heads (2) on the server line up with the rear
slots (2) on the slide rails. Slide the server down until the rear nail heads slip into the two rear slots.
Then, slowly lower the front of the server (3), (4) until the other nail heads slip into the other slots on
the slide rails. Ensure that the front latch (5) slides over the nail heads until it clicks into place.
3.
Push the release buttons on both rails (1) and push the server (2) all the way into the rack until it
clicks into place.
Figure 6. Place the server onto the mounting hardware
Installing the IBM Power System S922L (9008-22L)
7
Summary of Contents for S922L
Page 1: ...Power Systems Installing the IBM Power System S922L 9008 22L GI11 9932 00 IBM...
Page 2: ......
Page 3: ...Power Systems Installing the IBM Power System S922L 9008 22L GI11 9932 00 IBM...
Page 6: ...iv Power Systems Installing the IBM Power System S922L 9008 22L...
Page 16: ...xiv Power Systems Installing the IBM Power System S922L 9008 22L...
Page 50: ...34 Power Systems Installing the IBM Power System S922L 9008 22L...
Page 51: ......
Page 52: ...IBM Part Number 01LK648 Printed in USA GI11 9932 00 1P P N 01LK648...