Figure 62. Expansion canister
1
Canister fault indicator
2
Canister status
3
Canister power indicator
4
and
6
SAS link fault indicators
5
and
7
SAS link operational indicators
8
Canister release handles
Procedure
1. Disconnect the elbow of the lower cable management arm to swing it out of the way, as shown in
Figure 63 on page 63.
Follow the procedure that is described in “Moving the cable management arms” on page 66.
2. Carefully align the expansion canister with the expansion enclosure.
3. Rotate both the handles outward and insert the expansion canister into the expansion enclosure.
4. When the expansion canister is fully inserted, rotate each handle inward to lock it into position, as
shown in Figure 63 on page 63.
Figure 63. Install the expansion canister
5. Reconnect all the SAS cables to the appropriate SAS ports on the expansion canister, as described in
“Removing and installing a SAS cable: 2145-92F ” on page 87.
6. Reconnect the elbow of the lower cable management arm to the inner member of the slide rail.
Chapter 4. Installing an optional 5U SAS expansion enclosure 63
Summary of Contents for SAN Volume Controller 2145-SV1
Page 1: ...IBM SAN Volume Controller Hardware Installation Guide IBM...
Page 6: ...vi...
Page 48: ...16 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 62: ...30 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 72: ...40 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 168: ...136 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 176: ...144 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 178: ...146 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 182: ...150 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 192: ...160 SAN Volume Controller Model 2145 SV1 Hardware Installation Guide...
Page 193: ......
Page 194: ...IBM...