Table 7. Installation and basic system configuration (continued)
Task
Task details or additional information
Completed
Verify that the device operates
correctly.
v
Check the LEDs to verify operation of functional parts. Refer
to“Port-side LED locations” on page 51 and“Nonport-side LED
locations” on page 54.
v
The following commands can be useful to establish an
operational baseline for the device. Refer to theFabric OS
Command Reference for more information on these commands.
–
psshow
–
fanshow
–
tempshow
–
historyshow
–
errdump
Back up the configuration.
Use the interactive
configupload
command to back up the
configuration. Refer to “Verifying correct operation” on page 42 for
more information.
Optional: Power off the devices.
Enter the
shutdown
command and wait for the device to power
down, and then unplug the power cords. Refer to “Powering down
the device” on page 43 for more information.
Shipping carton contents
When unpacking the switch, verify that the contents of the shipping carton is complete. Save the
shipping carton and packaging in the event you need to return the shipment.
v
The SAN128B-6 switch
v
An accessory kit containing the following items:
– A serial cable
– Two 6-ft. power cords
– Power cord retainer clips
– Rubber feet
– China-RoHS Hazardous/Toxic Substance statement
– Network Advisor web pointer card.
– EZSwitch web pointer card
– Documentation web pointer card
v
Inner foam
12
SAN128B-6 Installation, Service, and User Guide
Summary of Contents for Storage Networking SAN128B-6
Page 6: ...vi SAN128B 6 Installation Service and User Guide...
Page 8: ...viii SAN128B 6 Installation Service and User Guide...
Page 84: ...64 SAN128B 6 Installation Service and User Guide...
Page 100: ...80 SAN128B 6 Installation Service and User Guide...
Page 114: ...94 SAN128B 6 Installation Service and User Guide...
Page 115: ......
Page 116: ...IBM Part Number 01JC270 Printed in USA SC27 9251 00 1P P N 01JC270...