background image

▌1▐

Display panel LEDs

▌2▐

Rack retention thumb screws

▌3▐

Power supply unit LEDs

▌4▐

Power supply units (PSUs)

▌5▐

PSU fascia (1U)

▌6▐

Front fascia (4U)

The display panel (

▌1▐

) contains three LEDs that describe the operational status of

the expansion enclosure. Table 15 describes the function and meaning of the LEDs
on the front display panel.

Table 15. Display panel LEDs

Function

Color

Status

Description

Power

Green

On

The expansion
enclosure power is
on; this LED is
controlled by the
expansion enclosure.

Off

The expansion
enclosure power is
off.

Identify

Blue

On

Identifies the
expansion enclosure;
this LED is controlled
by the system. Use
the management GUI
or service interface to
identify an enclosure.

Off

The expansion
enclosure is
operating normally.

svc00960

1

2

5

6

2

3

4

Figure 120. LEDs on the front of the expansion enclosure

132

Storwize V7000 Gen2 and Gen2+: Quick Installation Guide

Summary of Contents for StorVize V7000 Gen2

Page 1: ...IBM Storwize V7000 Gen2 and Gen2 MTM 2076 524 2076 624 2076 AF6 and 2076 92F Quick Installation Guide GC27 6500 08 IBM ...

Page 2: ...v The information in the Safety and environmental notices on page ix v The information in the IBM Environmental Notices and User Guide provided on a DVD This edition replaces GC27 6500 07 Copyright IBM Corporation 2014 2017 US Government Users Restricted Rights Use duplication or disclosure restricted by GSA ADP Schedule Contract with IBM Corp ...

Page 3: ...agement arm 2076 92F 58 Installing or replacing the cable management arm 2076 92F 63 Installing or replacing the top cover 2076 92F 68 Installing or replacing a drive 2076 92F 69 Installing or replacing a secondary expander module 2076 92F 74 Installing or replacing the fascia 2076 92F 77 Installing or replacing a power supply 2076 92F 79 Removing the fascia 2076 92F 82 Removing and installing a S...

Page 4: ...n Union Electromagnetic Compatibility Directive 156 Germany Electromagnetic Compatibility Directive 156 People s Republic of China Class A Statement 157 Taiwan Class A compliance statement 158 Taiwan Contact Information 158 Japan Voluntary Control Council for Interference Class A statement 158 Japan Electronics and Information Technology Industries Association Statement 158 Korean Electromagnetic ...

Page 5: ...s 59 45 Connectors for the upper cable management arm 60 46 Components of the lower CMA assembly 61 47 Upper and lower CMA assemblies moved aside 62 48 Lower CMA assembly moved 62 49 Release the upper CMA assembly 63 50 Release the lower CMA assembly 63 51 Upper and lower cable management arms 64 52 Upper and lower cable management arms 64 53 Connectors for the cable management arm 65 54 Install t...

Page 6: ...il assembly from the rear frame bracket 124 114 SAS cable connector orientation 124 115 Connecting the SAS cables 126 116 SAS port orientation on expansion enclosures 127 117 Features on the front of the 2076 92F expansion enclosure 128 118 Power cable connections on the back of the expansion enclosure 129 119 Features on the rear of the 2076 92F expansion enclosure 130 120 LEDs on the front of th...

Page 7: ...ght of expansion enclosure parts 34 10 Weight of expansion enclosure drives 35 11 Weight of an enclosure with 92 SAS drives 36 12 Enclosure weight as FRUs are installed 36 13 LEDs on the secondary expander modules 107 14 Examples of supported SAS chain combinations 127 15 Display panel LEDs 132 16 Power supply unit LEDs 133 17 LED indicators on drives 134 18 LED indicators on secondary expansion m...

Page 8: ...viii Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 9: ...ublications that were provided with the Storwize V7000 hardware 3 Find the matching identification number in the IBM Storwize V7000 Safety Notices Then review the topics about the safety notices to ensure that you are in compliance 4 Optional Read the multilingual safety instructions on the Storwize V7000 website a Go to www ibm com support b Search for Storwize V7000 c Click the documentation lin...

Page 10: ... the safety notice in each language To find the translated text for a caution or danger notice 1 In the product documentation look for the identification number at the end of each caution notice or each danger notice In the following examples the numbers D002 and C001 are the identification numbers DANGER A danger notice indicates the presence of a hazard that has the potential of causing death or...

Page 11: ...rsonal injury before lifting this unit remove all appropriate subassemblies per instructions to reduce the system weight C012 CAUTION Electrical current from power telephone and communication cables can be hazardous To avoid personal injury or equipment damage disconnect the attached power cords telecommunication systems networks and modems before you open the machine covers unless instructed othe...

Page 12: ... function before each use Do not over force moving or rolling the LIFT TOOL with stabilizer brake engaged v Do not raise lower or slide platform load shelf unless stabilizer brake pedal jack is fully engaged Keep stabilizer brake engaged when not in use or motion v Do not move LIFT TOOL while platform is raised except for minor positioning v Do not exceed rated load capacity See LOAD CAPACITY CHAR...

Page 13: ...nch is locked in position before releasing handle Read instruction page before operating this winch Never allow winch to unwind freely Freewheeling will cause uneven cable wrapping around winch drum damage cable and may cause serious injury C048 part 2 of 2 CAUTION v Do not install a unit in a rack where the internal rack ambient temperatures will exceed the manufacturer s recommended ambient temp...

Page 14: ... the documentation that comes with your rack cabinet for the weight of a loaded rack cabinet v Verify that all door openings are at least 760 x 230 mm 30 x 80 in v Ensure that all devices shelves drawers doors and cables are secure v Ensure that the four leveling pads are raised to their highest position v Ensure that there is no stabilizer bracket installed on the rack cabinet during movement v D...

Page 15: ...and only to connect or disconnect signal cables v Never turn on any equipment when there is evidence of fire water or structural damage v Disconnect the attached power cords telecommunications systems networks and modems before you open the device covers unless instructed otherwise in the installation and configuration procedures v Connect and disconnect cables as described in the following proced...

Page 16: ...net v Rack mounted devices are not to be used as shelves or work spaces Do not place objects on top of rack mounted devices v Each rack cabinet might have more than one power cord Be sure to disconnect all power cords in the rack cabinet when directed to disconnect power during servicing v Connect all devices installed in a rack cabinet to power devices installed in the same rack cabinet Do not pl...

Page 17: ...ddress specific issues relevant to the equipment provided General safety When you service the Storwize V7000 follow general safety guidelines Use the following general rules to ensure safety to yourself and others v Observe good housekeeping in the area where the devices are kept during and after maintenance v Follow the guidelines when lifting any heavy object 1 Ensure that you can stand safely w...

Page 18: ...ully holding it by its edges or frame v Do not touch solder joints pins or exposed printed circuitry v Do not leave the device where others can handle and possibly damage the device v While the device is still in its antistatic bag touch it to an unpainted metal part of the system unit for at least two seconds This action removes static electricity from the package and from your body v Remove the ...

Page 19: ...BM Knowledge Center contains all of the information that is required to install configure and manage the system The information collection in the IBM Knowledge Center is updated between product releases to provide the most current documentation The information collection is available at the following website http www ibm com support knowledgecenter STPVGU Storwize V7000 library Unless otherwise no...

Page 20: ...hat you can use from the Storwize V7000 command line interface CLI GC27 2287 IBM documentation and related websites Table 3 lists websites that provide publications and other information about the Storwize V7000 or related products or technologies The IBM Redbooks publications provide positioning and value guidance installation and implementation experiences solution scenarios and step by step pro...

Page 21: ...at you are commenting on v A detailed description of any information that should be changed How to get information help and technical assistance If you need help service technical assistance or just want more information about IBM products you will find a wide variety of sources available from IBM to assist you Information IBM maintains pages on the web where you can get information about IBM prod...

Page 22: ...omer number should be on the customer information worksheet or on the invoice from your storage purchase If asked for an operating system use Storage Hardware option Provide the serial number and appropriate 4 digit machine type For Storwize V7000 the machine type is 2076 In the US and Canada hardware service and support can be extended to 24x7 on the same day The base warranty is 9x5 on the next ...

Page 23: ...nstructions Also some documents are available through the IBM Publications Center Sign up for the Support Line Offering If you have questions about how to use and configure the machine sign up for the IBM Support Line offering to get a professional answer The maintenance that is supplied with the system provides support when there is a problem with a hardware component or a fault in the system mac...

Page 24: ...xxiv Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 25: ...at any cables that you are supplying are available for installation Installation scenarios Depending on your order this documentation steps you through setting up your system for the following scenarios v Setting up a new system that consists of a control enclosure only In this case you are not installing any expansion enclosures v Setting up a new system that consists of a control enclosure and o...

Page 26: ...0 Gen2 and Storwize V7000 Gen2 control enclosure on page 13 Installing support rails for Storwize V7000 Gen2 and Storwize V7000 Gen2 expansion enclosures on page 17 Installing support rails for Storwize V7000 Gen2 and Storwize V7000 Gen2 expansion enclosures on page 171 Installing support rails for the Storwize V7000 Gen2 and Storwize V7000 Gen2 control enclosure on page 13 Installing support rail...

Page 27: ... the Storwize V7000 on page x and Danger notices for Storwize V7000 on page xiv for a summary of the situations that can be potentially hazardous to you Before installing read and understand the following caution and danger statements v Use safe practices when lifting The fully populated enclosure weighs about 37 kg 82 lbs At least three people are required to lift and install the enclosure into t...

Page 28: ...ct or disconnect signal cables Never turn on any equipment when there is evidence of fire water or structural damage Disconnect the attached power cords telecommunications systems networks and modems before you open the device covers unless instructed otherwise in the installation and configuration procedures Connect and disconnect cables as described in the following procedures when installing mo...

Page 29: ...osure 6195 HC1 3 years IBM Storwize V7000 Gen2 Control Enclosure 6195 524 3 years IBM Storwize V7000 Gen2 Control Enclosure 2076 12F 3 years IBM Storwize V7000 12 slot Expansion Enclosure for 3 5 inch drives 2076 24F 3 years IBM Storwize V7000 24 slot Expansion Enclosure for 2 5 inch drives 2076 AFF 3 years IBM Storwize V7000 24 slot Expansion Enclosure for 2 5 inch Flash Drives 6195 12F 3 years I...

Page 30: ...air __ v Compression Accelerator card pair Options applicable to expansion enclosures Note All options other than cables are preinstalled __ v Expansion enclosure attachment cables __ v Drives __ v Power cords for connection to wall sockets Identify the hardware components The following graphics identify the hardware components and port locations for the control enclosure and expansion enclosure o...

Page 31: ...ach canister has two SAS ports for connecting to optional expansion enclosures Control enclosure support rails The left and right control enclosure support rails Figure 3 on page 8 are designed specifically for installation of a control enclosure v The ledge on the inside of the rails supports the entire length of a control enclosure v At the rear end of the control enclosure support rail the top ...

Page 32: ...n canister v 1 LEDs v 2 SAS ports Each canister has two SAS ports that are numbered 1 on the left and 2 on the right Port 1 is used to connect to a SAS expansion port on a node canister or port 2 of another expansion canister fab10051 Figure 3 Control enclosure support rails of a Storwize V7000 system fab10006 2 1 IN DC OK IN DC OK Figure 4 Rear view of a Storwize V7000 expansion enclosure 8 Storw...

Page 33: ...en the rack is subjected to quake or vibration v The expansion enclosure support rails adjust to fit racks from 595 mm to 755 mm deep measured between the front and rear rack rails Identifying Storwize V7000 2076 624 node canisters The Storwize V7000 2076 624 node canister includes hardware changes from the Storwize V7000 2076 524 node canister The changes can facilitate distinguishing between the...

Page 34: ... 2x DIMMs on default v Canister boot drive changes to M 2 form factor from half slim SATA form factor v Support is dropped for 8 Gbps 4 port FC adapter The labeling on the 2076 624 node canister also differs from the 2076 524 node canister v A 600 label is included on the rear of the canister under the jack spanner port facing backwards v The top and bottom serial labels on the release handle are ...

Page 35: ...em can consist of up to four control enclosures Each control enclosure can be connected to up to 20 expansion enclosures two SAS chains of up to 10 expansion enclosures each v For best performance dived the total number of expansion enclosures to be installed between each control enclosure in the system v Where expansion enclosures are to be installed distribute them evenly into rack space above a...

Page 36: ...12 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 37: ...stalling support rails for the Storwize V7000 Gen2 and Storwize V7000 Gen2 control enclosure Before you install the control enclosure you must first install the support rails for it Procedure To install the support rails for the control enclosure complete the following steps 1 Locate the control enclosure rails Figure 8 The rail assembly consists of two rails that must be installed in the rack cab...

Page 38: ...g at the front of the rack cabinet identify the two standard rack units 2U of space in the rack into which you want to install the support rails Figure 10 on page 15 shows two rack units with the front mounting holes identified fab10050 Figure 9 Installing the rail spring 14 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 39: ...s in your rack see Table 7 Table 7 Selecting bracket pins for your rack Mounting holes Bracket pins Round unthreaded Use the preinstalled medium pins Round threaded Unscrew the medium pins and replace with the smaller pins that are supplied with the rails Square Unscrew the medium pins and replace with the large pins that are supplied with the rails 5 At each end of the rail grasp the tab 1 and pu...

Page 40: ...e front of the rail press the two bracket pins into the holes in the rack flanges 10 Close the front hinge bracket to secure the rail to the rack cabinet flange See Figure 12 11 Secure the rear of the rail to the rear rack flange with an M5 screw 12 Repeat the steps to secure the opposite rail to the rack cabinet 13 Repeat the procedure to install rails for each additional control enclosure fab100...

Page 41: ...including two rail springs two sets of eight bracket pins and two M5 screws Set the hardware aside for use later in the installation process 3 Install a spring on each rail a Extend the rail to its full length b Push one looped end of a spring over one stud on the inside of the rail See Figure 14 on page 18 Note Some models of rail have the studs on the outside of the rail c Stretch the spring sli...

Page 42: ... rack units 2U of space in the rack into which you want to install the support rails Figure 15 on page 19 shows two rack units with the front mounting holes identified fab10052 Figure 14 Installing the rail spring 18 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 43: ...s in your rack see Table 8 Table 8 Selecting bracket pins for your rack Mounting holes Bracket pins Round unthreaded Use the preinstalled medium pins Round threaded Unscrew the medium pins and replace with the smaller pins that are supplied with the rails Square Unscrew the medium pins and replace with the large pins that are supplied with the rails 6 At each end of the rail grasp the tab 1 and pu...

Page 44: ...l press the two bracket pins into the holes in the rack flanges 11 Close the front hinge bracket to secure the rail to the rack cabinet flange See Figure 17 12 Secure the rear of the rail to the rear rack flange with an M5 screw that is provided with the rack kit 13 Repeat the steps to secure the opposite rail to the rack cabinet 14 Repeat the procedure to install rails for each additional expansi...

Page 45: ...a control enclosure with drives installed requires at least three people v Install a control enclosure only onto the control enclosure rails supplied with the enclosure v Install an expansion enclosure only onto the expansion enclosure rails supplied with the enclosure v Load the rack from the bottom up to ensure rack stability Empty the rack from the top down Procedure To install an enclosure com...

Page 46: ...k mounting screw holes See Figure 19 and Figure 20 on page 23 5 Reinstall the left and right end caps See Figure 20 on page 23 The left end cap has indicator windows that align with the status LEDs light emitting diodes on the edge of the enclosure a Ensure that the serial number of the end cap matches the serial number on the rear of the enclosure b Fit the slot on the top of the end cap over the...

Page 47: ... list of guidelines to ensure that your configuration is valid Do not begin connecting the cables until you have read SAS cabling guidelines on page 25 Procedure To install the cables complete the following steps 1 Using the supplied SAS cables connect the control enclosure to the expansion enclosure at rack position 1 as shown in Figure 21 on page 24 a Connect SAS port 1 of the left node canister...

Page 48: ...S port 1 of the right expansion canister in the second expansion enclosure 3 If additional expansion enclosures are installed connect each one to the previous expansion enclosure in a chain use two Mini SAS HD to Mini SAS HD cables as shown in Figure 21 Note A control enclosure can support up to 20 expansion enclosures 10 above the control enclosure and 10 below the control enclosure 4 If addition...

Page 49: ... ends of a SAS cable are inserted correctly the green link LEDs next to the connected SAS ports are lit Guidelines Be aware of the following guidelines when you attach the cables to the SAS ports Be aware of the following guidelines when you attach the cables to the SAS ports in 2U expansion enclosures v No more than ten expansion enclosures can be chained to SAS port 1 of a node canister The expa...

Page 50: ...isk of cable damage when replaceable units are removed or inserted For information about the SAS cabling requirements for 5U expansion enclosures see Connecting the optional 2076 92F SAS expansion enclosures on page 124 Installing an optional 5U SAS expansion enclosure Up to two chains of expansion enclosures can be attached to each I O group in the system Installing an optional SAS expansion encl...

Page 51: ...he end of each notice for example D005 to find the matching translated notice in IBM Storwize V7000 Safety Notices DANGER DANGER Serious injury or death can occur if loaded lift tool falls over or if a heavy load falls off the lift tool Always completely lower the lift tool load plate and properly secure the load on the lift tool before moving or using the lift tool to lift or move an object D010 ...

Page 52: ...ack mounted devices are not to be used as shelves or work spaces Do not place objects on top of rack mounted devices f2c00064 v Each rack cabinet might have more than one power cord Be sure to disconnect all power cords in the rack cabinet when directed to disconnect power during servicing v Connect all devices installed in a rack cabinet to power devices installed in the same rack cabinet Do not ...

Page 53: ...ower connection to a rack refer to the rating labels located on the equipment in the rack to determine the total power requirement of the supply circuit v For sliding drawers Do not pull out or install any drawer or feature if the rack stabilizer brackets are not attached to the rack Do not pull out more than one drawer at a time The rack might become unstable if you pull out more than one drawer ...

Page 54: ...inet Refer to the documentation that comes with your rack cabinet for the weight of a loaded rack cabinet v Verify that all door openings are at least 760 x 230 mm 30 x 80 in v Ensure that all devices shelves drawers doors and cables are secure v Ensure that the four leveling pads are raised to their highest position v Ensure that there is no stabilizer bracket installed on the rack cabinet during...

Page 55: ...r stud goes into where the terminal conductor and the lock washer contact should be free of any non conductive material to allow for metal to metal contact All PROTECTIVE EARTHING CONDUCTORS should terminate at this main protective earthing terminal or at points marked with R010 CAUTION The weight of this part or unit is more than 55 kg 121 2 lb It takes specially trained persons a lifting device ...

Page 56: ... function before each use Do not over force moving or rolling the LIFT TOOL with stabilizer brake engaged v Do not raise lower or slide platform load shelf unless stabilizer brake pedal jack is fully engaged Keep stabilizer brake engaged when not in use or motion v Do not move LIFT TOOL while platform is raised except for minor positioning v Do not exceed rated load capacity See LOAD CAPACITY CHAR...

Page 57: ...ction page before operating this winch Never allow winch to unwind freely Freewheeling will cause uneven cable wrapping around winch drum damage cable and may cause serious injury C048 part 2 of 2 CAUTION If the System slide rails are installed above EIA location 29U the ServerLIFT tool or other qualified lift tool must be used as a safety precaution for servicing Position the lift tool platform s...

Page 58: ...F expansion enclosure above position 22U in the rack Weight of expansion enclosure parts Table 9 summarizes the weight and quantity of the parts FRUs that are shipped with the 2076 92F expansion enclosure Table 9 Weight of expansion enclosure parts FRU description FRU part number Weight per unit Quantity shipped Total weight kg lbs kg lb Enclosure FRU 01LJ112 42 5 93 696 1 42 500 93 696 Rail kit 0...

Page 59: ... TB 10 K 2 5 inch hard disk drive 01LJ063 AH74 0 304 0 670 6 TB 7 2 K 3 5 inch Near Line SAS hard disk drive 01LJ064 AH77 0 876 1 931 8 TB 7 2 K 3 5 inch Near Line SAS hard disk drive 01LJ065 AH78 0 876 1 931 10 TB 7 2 K 3 5 inch Near Line SAS hard disk drive 01LJ066 AH79 0 876 1 931 1 6 TB 2 5 inch tier 0 flash drive 01LJ067 AH7D 0 224 0 494 3 2 TB 2 5 inch tier 0 flash drive 01LJ068 AH7E 0 224 0...

Page 60: ... installed Table 12 Enclosure weight as FRUs are installed Enclosure assembly Approximate weight FRUs installed FRUs not installed kg lb v Enclosure 01LJ112 v Secondary expansion modules v Fascia 1U and 4U v PSUs v Expansion canisters v Fan modules v Fan interface board v Display assembly v Drives v Cover 42 5 93 7 v Enclosure 01LJ112 v Secondary expansion modules v Fascia 1U and 4U v PSUs v Expan...

Page 61: ...112 v Secondary expansion modules v Fascia 1U and 4U v PSUs v Expansion canisters v Fan modules v Fan interface boards v 92 2 5 inch tier 1 flash drives v Cover 78 6 173 3 v Enclosure 01LJ112 v Secondary expansion modules v Fascia v PSUs v Expansion canisters v Fan modules v Fan interface board v 92 2 5 inch hard disk drives v Cover 86 189 6 v Enclosure 01LJ112 v Secondary expansion modules v Fasc...

Page 62: ...nents on the front of the enclosure Figure 24 shows the front of the 2076 92F expansion enclosure In the figure all parts are installed in the enclosure 1 Display panel indicators 2 Rack retention thumb screws 3 Power supply unit indicators 4 Power supply units PSUs 5 PSU fascia 1U 6 Front fascia 4U However as Figure 25 on page 39 shows the 4U and 1U fascias are packaged separately You must attach...

Page 63: ...es are accessible from the back of the enclosure 1 Power cable connector for PSU 2 2 Power cable retention clamps x4 svc01042 Figure 25 Front fascia of the 2076 92F expansion enclosure svc01010 8 7 7 8 1 2 4 5 3 6 9 Figure 26 Features on the rear of the 2076 92F expansion enclosure Chapter 2 Installing the Storwize V7000 Gen2 and Storwize V7000 Gen2 hardware 39 ...

Page 64: ...nsion enclosure The support rails are packaged separately from the expansion enclosure Cable management arm The cable management arm CMA which consists of an upper and lower assembly are packaged separately from the expansion enclosure As Figure 28 on page 41 shows each CMA assembly is attached to the rear end of the support rails svc00962 Figure 27 2076 92F support rails 40 Storwize V7000 Gen2 an...

Page 65: ...part or unit C011 CAUTION To avoid personal injury before lifting this unit remove all appropriate subassemblies per instructions to reduce the system weight C012 Important Before you unpack move install or service the 2076 92F expansion enclosure and its parts always perform the following tasks v Read and follow the safety notices and instructions as described in Safety notices and considerations...

Page 66: ...are installed in the enclosure However due to weight considerations you must remove some parts and then reinstall them as part of the initial installation process Note Drives are not included in installation package for the enclosure they are provided in a separate package Procedure 1 Remove the cardboard tray that contains the slide rails cable management arm and fascia from cardboard box in whic...

Page 67: ...ails 2076 92F on page 46 8 Attach the remaining sections of the support rails to the rack as described in step 6 on page 48 in Installing or replacing the support rails 2076 92F on page 46 9 Move the mechanical lift to the front of the rack Align the inner section of the rails with the mid section of the rails that are extending from the rack 10 On each side push the inner section and middle secti...

Page 68: ...8 on page 56 in Installing or replacing an expansion enclosure in a rack 2076 92F on page 49 17 Remove the cable management arm assembly from its packaging 2 in Figure 29 on page 42 18 Attach the cable management arm as described in Installing or replacing the cable management arm 2076 92F on page 63 19 Connect the SAS cables as described in Removing and installing a SAS cable 2076 92F on page 85 ...

Page 69: ... from a rack 2076 92F on page 92 for details 2 Slide the release latch 1 in the direction that is shown in Figure 32 3 Slide the cover toward the front of the expansion enclosure 2 as shown in Figure 32 4 Carefully lift the cover up as shown in Figure 33 5 Place the cover in a safe location Replace the cover 1 2 svc00977 Figure 32 Releasing the 2076 92F cover svc00978 Figure 33 Removing the 2076 9...

Page 70: ...hardware which is shown in Figure 34 aside for use later in the installation process 2 Select an available 5U space in your rack to install the expansion enclosure Important When all components and drives are installed the expansion enclosure is heavy Install the support rails and enclosure at the lowest available position Do not install the rails and enclosure above position U25 in the rack 3 Rem...

Page 71: ...section of the rail onto each side of the expansion enclosure as shown in Figure 37 on page 48 Pull tab forward a Push x2 svc01080 Figure 35 Detaching the inner rail section svc00965 1 Figure 36 Screw locations to attach the inner rail to the enclosure Chapter 2 Installing the Storwize V7000 Gen2 and Storwize V7000 Gen2 hardware 47 ...

Page 72: ...hows the front of the rail that is attached to the frame click 1 2 M4x6L locking svc01081 Figure 37 Attaching the inner rail section to the enclosure 1 2 Click M5x13L Rear Bracket 3 1 Click 1 2 PUSH Front Bracket 2 M5x13L svc00966 Figure 38 Installing the rail assembly to the rack frame 48 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 73: ...F Installing or replacing an expansion enclosure in a rack 2076 92F Use the following procedure to place the 2076 92F expansion controller in a rack during the installation process To complete some service tasks you might also need to slide the enclosure back in to the rack svc01022 Figure 39 Example of required rack space Chapter 2 Installing the Storwize V7000 Gen2 and Storwize V7000 Gen2 hardwa...

Page 74: ...ways install servers and optional devices starting from the bottom of the rack cabinet v Rack mounted devices are not to be used as shelves or work spaces Do not place objects on top of rack mounted devices f2c00064 v Each rack cabinet might have more than one power cord Be sure to disconnect all power cords in the rack cabinet when directed to disconnect power during servicing v Connect all devic...

Page 75: ...ower connection to a rack refer to the rating labels located on the equipment in the rack to determine the total power requirement of the supply circuit v For sliding drawers Do not pull out or install any drawer or feature if the rack stabilizer brackets are not attached to the rack Do not pull out more than one drawer at a time The rack might become unstable if you pull out more than one drawer ...

Page 76: ...oaded rack cabinet Refer to the documentation that comes with your rack cabinet for the weight of a loaded rack cabinet v Verify that all door openings are at least 760 x 230 mm 30 x 80 in v Ensure that all devices shelves drawers doors and cables are secure v Ensure that the four leveling pads are raised to their highest position v Ensure that there is no stabilizer bracket installed on the rack ...

Page 77: ...ge sleeve area Latest revision manual available on vendor s website v Test verify stabilizer brake function before each use Do not over force moving or rolling the LIFT TOOL with stabilizer brake engaged v Do not raise lower or slide platform load shelf unless stabilizer brake pedal jack is fully engaged Keep stabilizer brake engaged when not in use or motion v Do not move LIFT TOOL while platform...

Page 78: ...ed Be sure winch is locked in position before releasing handle Read instruction page before operating this winch Never allow winch to unwind freely Freewheeling will cause uneven cable wrapping around winch drum damage cable and may cause serious injury C048 part 2 of 2 CAUTION If the System slide rails are installed above EIA location 29U the ServerLIFT tool or other qualified lift tool must be u...

Page 79: ...f you are reinstalling the expansion enclosure in the rack after you performed a service task for example replacing the enclosure you must also perform the following tasks v Reinstall all of the following parts Cover Drives Fan modules Power supply units and 1U fascia Secondary expansion modules Expansion canisters and SAS cables v Reconnect both power cables to the expansion enclosure Procedure 1...

Page 80: ...ribed in the following topics You can reinstall the parts in any order v Installing or replacing a power supply 2076 92F on page 79 and Installing or replacing the fascia 2076 92F on page 77 v Installing or replacing an expansion canister 2076 92F on page 57 and Removing and installing a SAS cable 2076 92F on page 85 v Installing or replacing a fan module 2076 92F on page 88 Sliding the enclosure ...

Page 81: ...hows an example of an expansion canister If either of the two expansion canisters has a failure the other expansion canister assumes the full I O load 1 Canister fault indicator 2 Canister status 3 Canister power indicator 4 and 6 SAS link fault indicators 5 and 7 SAS link operational indicators 8 Canister release handles Procedure 1 Disconnect the elbow of the lower cable management arm to swing ...

Page 82: ...You might need to move the cable management arm CMA aside to complete service tasks If needed you can also remove the CMA from the 2076 92F expansion enclosure About this task The cable management arm CMA consists of an upper and lower arm assembly as Figure 44 on page 59 shows The upper and lower are independent of each other They can be installed moved or removed from the enclosure individually ...

Page 83: ...ver you might need to remove a CMA assembly from the 2076 92F expansion enclosures To do so complete step 1 on page 60 through step 8 on page 61 in following procedure Procedure Remove the upper CMA assembly The connectors of the CMA are installed on the rail hooks at the end of the support rails Figure 45 on page 60 shows the connectors on the upper CMA assembly svc01017 Figure 44 Upper and lower...

Page 84: ...er connector from the inner member of the left support rail 4 in Figure 45 5 Remove the inner connector of the upper CMA assembly 1 from the inner member of the left support rail 2 as shown in Figure 45 Remove the lower CMA assembly Note The procedure for removing the lower CMA assembly is the same as the procedure to remove the upper CMA assembly However the connector locations are reversed For e...

Page 85: ...reinstall the CMA or replace it with one from FRU stock follow the procedure in Installing or replacing the cable management arm 2076 92F on page 63 Moving the cable management arms About this task To complete most service tasks you can swing the CMA assemblies out of the way You can move each arm independently or you can move both arms For example Figure 47 on page 62 shows that both of the CMA a...

Page 86: ...r is accessible Procedure 1 To release the upper CMA push the latch on the support rail connector 5 to release it from the connector base 6 on the right rail svc01024 Figure 47 Upper and lower CMA assemblies moved aside svc01023 Figure 48 Lower CMA assembly moved 62 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 87: ...dures to install the cable management arm CMA for the 2076 92F expansion enclosure You can also use these procedure to replace a faulty CMA assembly About this task As part of the initial installation of the 2076 92F expansion enclosure you must attach the CMA You might also need to replace a faulty CMA with a new one from FRU stock The cable management arm CMA consists of an upper arm and a lower...

Page 88: ...p straps from the upper and lower CMA assemblies The straps are used only for shipping Installing the upper CMA assembly Figure 53 on page 65 shows the connectors on the upper CMA assembly svc01017 Figure 51 Upper and lower cable management arms svc00974 Figure 52 Upper and lower cable management arms 64 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 89: ...ber of the left support rail 2 as shown in Figure 54 from the outer and inner support rails 3 Install the inner connector of the upper CMA assembly 3 to the inner member of the left support rail 4 as shown in Figure 55 on page 66 svc01035 1 2 3 4 5 6 Figure 53 Connectors for the cable management arm 1 4 2 svc01036 Figure 54 Install the inner connector of the upper CMA to the inner member of the su...

Page 90: ... However the connector locations are reversed For comparison Figure 57 on page 67 shows the upper and lower CMA assemblies as they are aligned to the support rails The support rail connector of the upper CMA attaches to the right rail The support rail connector of the lower CMA 11 attaches to the left rail 1 3 4 svc01037 Figure 55 Install the inner connector of the upper CMA to the inner member of...

Page 91: ...MA assembly 11 to the connector on the left support rail 12 as shown in Figure 57 Ensure the lower CMA assembly is securely attached to the hooks on the end of the support rails 8 Route the cables and power cords on the CMA If needed secure them with cable ties or hook and loop fasteners Notes v Use the cable straps that are provided on the rear of the system to retain the cables and prevent them ...

Page 92: ... the enclosure might cause the enclosure or its components to shut down to protect from overheating About this task To install or replace the top cover on the 2076 92F expansion enclosure complete the following steps Procedure 1 Carefully lower the cover and ensure that it is aligned correctly with the back of the enclosure as shown in Figure 58 2 Push the cover release lever to the side 2 as show...

Page 93: ...g off the expansion enclosure However to maintain operating temperature do not keep the cover off an operational enclosure for more than 15 minutes The reduction in airflow through the enclosure might cause the enclosure or its components to shut down to protect from overheating v Ensure that the drive that you are replacing is not a spare or a member of an array The drive status is shown in Pools...

Page 94: ...re from a rack 2076 92F on page 92 3 Remove the cover as described in Removing the top cover 2076 92F on page 44 4 Locate the empty drive slot to receive the new drive or that contains the faulty drive that you want to replace Note When a drive is faulty the amber fault indicator is lit 3 in Figure 61 Do not replace a drive unless the drive fault indicator is on or you are instructed to do so by a...

Page 95: ...re installed correctly Drives are installed in slots 1 14 of row A and the installation continues in slot 15 in row B In Figure 64 on page 72 the drives are not installed correctly Slot 1 A1 does not contain a drive In addition drives are installed in row B even though row A contains empty drive slots svc01054 Figure 62 Drive locations in a 2076 92F expansion enclosure svc01044 Figure 63 Correct d...

Page 96: ...of the drive assembly is in the open unlocked position 7 Align the drive carrier into the appropriate drive slot 8 Gently push the drive down until it stops and the bottom of the latch is aligned with the top of the partition Ensure that the handle is not open more than 45 degrees from the drive carrier 2 in Figure 65 on page 73 svc01045 X Figure 64 Incorrect drive installation 72 Storwize V7000 G...

Page 97: ...tate the handle down to lock the drive assembly into the chassis 3 in Figure 65 1 2 3 4 svc00982 Figure 65 Replace the drive Chapter 2 Installing the Storwize V7000 Gen2 and Storwize V7000 Gen2 hardware 73 ...

Page 98: ...ry expander modules after you perform other service tasks Before you begin DANGER Hazardous voltage present Voltages present constitute a shock hazard which can cause severe injury or death L004 DANGER 240VA Hazardous energy present Voltages with hazardous energy might cause heating when shorted with metal which might result in splattered metal burns or both L005 CAUTION Use caution when you are r...

Page 99: ...s missing or is faulty the expansion canisters can communicate only with SAS port 1 on each drive Similarly if secondary expander module 1 is missing or is faulty the expansion canisters can communicate only with SAS port 2 on each drive This task assumes that the following conditions were met v The top cover was removed as described in Removing the top cover 2076 92F on page 44 v The secondary ex...

Page 100: ...own in Figure 68 4 Carefully align the edges of the secondary expander module in the guide slot in the enclosure as shown in Figure 69 on page 77 svc01068 1 2 Figure 67 LEDs on a secondary expansion module svc01026 Figure 68 Open the secondary expander module handles 76 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 101: ...ng power Storwize V7000 2076 92F expansion enclosure LEDs and indicators on page 131 describes the status indicated by the LEDs Installing or replacing the fascia 2076 92F During the initial installation process or after you perform service you can install the fascia components on the front of a 2076 92F expansion enclosure About this task The 4U fascia covers the display panel of the expansion en...

Page 102: ...s on the front flange of the enclosure 3 Replace the four screws to reattach the 4U fascia Secure the screws from the back of the flange and into the rear of the fascia Each side of the 4U fascia contains two screws Attach the bottom 1U fascia 4 Reattach the bottom 1U fascia that covers the power supply units PSUs Align the fascia with the enclosure and gently push it until it clicks into place on...

Page 103: ...e you begin Important You can replace a PSU without powering off the expansion enclosure However to maintain operating temperature replace the PSU within 10 minutes of its removal When a PSU is removed the reduction in airflow through the enclosure might cause the enclosure or its components to shut down to protect from overheating svc01043 Figure 71 Replace fascia components on the expansion encl...

Page 104: ...enclosure as described in Removing the fascia 2076 92F on page 82 v You are aware of the procedures for handling static sensitive devices Procedure 1 Read all safety information 2 Rotate the handles on the PSU outward as shown in Figure 72 3 Slide the PSU forward into the chassis until it clicks in to place as shown in Figure 73 on page 81 svc01011 Figure 72 Preparing to install the power supply 8...

Page 105: ...icks in to place 5 Verify that the AC input and the DC power indicators are lit on the front of the PSU as shown in Figure 74 on page 82 svc01033 Figure 73 Install the power supply Chapter 2 Installing the Storwize V7000 Gen2 and Storwize V7000 Gen2 hardware 81 ...

Page 106: ...a from the front of a 2076 92F expansion enclosure About this task The expansion enclosure has a 4U front fascia that covers the display panel and a 1U fascia that covers the power supply units PSUs As Figure 75 on page 83 shows the fascias are independent you can remove or replace one without having to remove or replace the other svc01032 Figure 74 Power supply indicators 82 Storwize V7000 Gen2 a...

Page 107: ...t is available to support the weight of the enclosure Remove the front 4U fascia 2 Remove the front fascia by removing the two screws that attach the fascia to the flange on each side of the chassis as shown in Figure 76 on page 84 x4 svc01042 Figure 75 Fascia components on the expansion enclosure Chapter 2 Installing the Storwize V7000 Gen2 and Storwize V7000 Gen2 hardware 83 ...

Page 108: ...engage from the slot and pin that connect it to each side of the chassis You must remove the bottom fascia to access and service either PSU However as Figure 77 on page 85 shows you do not have to remove the front fascia svc01043 Figure 76 Remove fascia components from the expansion enclosure 84 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 109: ...stem Do not inadvertently disturb or remove any cables that you are not instructed to remove If you replace more than one cable record which two ports canisters and enclosures each cable connects so you can match the connections with the replacement cables The system cannot operate if the SAS cabling to the expansion enclosure is incorrect When the 2076 92F expansion enclosure is installed in the ...

Page 110: ...til you hear or feel a click When the cable is successfully inserted you cannot disconnect the cable without pulling on the blue tag Connecting to a Storwize V7000 node 7 Connect the SAS cable to the SAS port with blue tab above the connector that is facing towards the top of the node You will hear or feel a click when the cable is successfully inserted you cannot disconnect the cable without pull...

Page 111: ...age 88 shows the LEDs of expansion canister 1 on a 2076 92F expansion enclosure The SAS cable is successfully inserted in to port 1 input port 2 output does not contain a SAS cable svc01082 Figure 79 Example of SAS cables routed through the cable management arms Chapter 2 Installing the Storwize V7000 Gen2 and Storwize V7000 Gen2 hardware 87 ...

Page 112: ... to protect from overheating About this task The expansion enclosure might or might not be powered on depending on the number of fan modules that need to be replaced For example the expansion enclosure must be powered off if all four fan modules are removed This task assumes that the following condition was met v You have removed a fan module following the process described in Removing a fan modul...

Page 113: ...B in a 2076 92F expansion enclosure Before you begin This task assumes that the following conditions are met v You have removed the fan interface board following the process described in Removing a fan interface board 2076 92F on page 113 v All power cables were removed from the enclosure as described in Powering off the expansion enclosure 2076 92F on page 130 svc01016 Figure 81 Fan module orient...

Page 114: ... 3 and 4 If the fault LED on each fan module is lit it is possible that the FIB that controls those modules needs to be replaced You can also issue the lsenclosurefanmodule command to display the status of the fans If you removed the FIBs from a faulty expansion enclosure you must reinstall them in the replacement enclosure Refer to the procedure described in Replacing an enclosure 2076 92F on pag...

Page 115: ...g screws that secure the FIB to the drive board as shown in Figure 85 svc01031 Figure 84 Insert the new FIB in the chassis svc01029 Figure 85 Secure the FIB to the drive board Chapter 2 Installing the Storwize V7000 Gen2 and Storwize V7000 Gen2 hardware 91 ...

Page 116: ...page 88 8 Replace the drives secondary expander modules and other heavy FRUs that were removed before the enclosure was removed from the rack 9 Replace the top cover as described in Installing or replacing the top cover 2076 92F on page 68 10 Reconnect power to the enclosure as described in Powering on the expansion enclosure 2076 92F on page 127 Removing an expansion enclosure from a rack 2076 92...

Page 117: ... servers and optional devices starting from the bottom of the rack cabinet v Rack mounted devices are not to be used as shelves or work spaces Do not place objects on top of rack mounted devices f2c00064 v Each rack cabinet might have more than one power cord Be sure to disconnect all power cords in the rack cabinet when directed to disconnect power during servicing v Connect all devices installed...

Page 118: ...he correct power connection to a rack refer to the rating labels located on the equipment in the rack to determine the total power requirement of the supply circuit v For sliding drawers Do not pull out or install any drawer or feature if the rack stabilizer brackets are not attached to the rack Do not pull out more than one drawer at a time The rack might become unstable if you pull out more than...

Page 119: ...o the documentation that comes with your rack cabinet for the weight of a loaded rack cabinet v Verify that all door openings are at least 760 x 230 mm 30 x 80 in v Ensure that all devices shelves drawers doors and cables are secure v Ensure that the four leveling pads are raised to their highest position v Ensure that there is no stabilizer bracket installed on the rack cabinet during movement v ...

Page 120: ...r metal to metal contact All PROTECTIVE EARTHING CONDUCTORS should terminate at this main protective earthing terminal or at points marked with R010 DANGER DANGER Serious injury or death can occur if loaded lift tool falls over or if a heavy load falls off the lift tool Always completely lower the lift tool load plate and properly secure the load on the lift tool before moving or using the lift to...

Page 121: ...fore each use Do not over force moving or rolling the LIFT TOOL with stabilizer brake engaged v Do not raise lower or slide platform load shelf unless stabilizer brake pedal jack is fully engaged Keep stabilizer brake engaged when not in use or motion v Do not move LIFT TOOL while platform is raised except for minor positioning v Do not exceed rated load capacity See LOAD CAPACITY CHART regarding ...

Page 122: ...d cause serious injury Not for moving humans Make certain clicking sound is heard as the equipment is being raised Be sure winch is locked in position before releasing handle Read instruction page before operating this winch Never allow winch to unwind freely Freewheeling will cause uneven cable wrapping around winch drum damage cable and may cause serious injury C048 part 2 of 2 About this task T...

Page 123: ...support the weight of the enclosure Removing the expansion enclosure from the rack Note Continue the procedure step 5 through step 7 on page 100 only if you must completely remove the expansion enclosure from the rack to complete a service procedure 5 Power down the expansion enclosure and disconnect all power cords 6 Remove all of the following parts from the enclosure as described in the followi...

Page 124: ...s ready to be installed v Do not remove a PSU from an operational enclosure for more than approximately 10 minutes The reduction in airflow through the enclosure might cause the enclosure or its components to shut down to protect from overheating About this task Each PSU provides cooling to the lower part of the enclosure Ensure that the second PSU in the enclosure is powered on and operating corr...

Page 125: ...the expansion enclosure chassis and place it in a safe location as shown in Figure 89 on page 102 svc01033 Figure 88 Releasing the power supply handles Chapter 2 Installing the Storwize V7000 Gen2 and Storwize V7000 Gen2 hardware 101 ...

Page 126: ... faulty drive from a 2076 92F expansion enclosure to replace it with a new one received from FRU stock Before you begin Ensure that the drive is not a spare or a member of an array The drive status is shown in Pools Internal Storage in the management GUI If the drive is a member of an array follow the fix procedures in the management GUI The fix procedures minimize the risk of losing data or acces...

Page 127: ...afety information 2 Use the slide rails to pull the enclosure out from the rack as described in Removing an expansion enclosure from a rack 2076 92F on page 92 3 Remove the top cover as described in Removing the top cover 2076 92F on page 44 4 Locate the slot that contains the drive assembly that you want to remove Note When a drive is faulty the amber fault indicator is lit 3 in Figure 90 Do not ...

Page 128: ...e The columns 1 14 are marked on the front edge of the enclosure The row and column marks are visible when the top cover is removed 5 Slide the release latch forward 1 as shown in Figure 92 on page 105 svc01054 Figure 91 Drive locations in a 2076 92F expansion enclosure 104 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 129: ...drive you need to remove Replace the drive 9 To reinstall a drive or replace it with one from FRU stock follow the procedure in Installing or replacing a drive 2076 92F on page 69 Removing a secondary expander module 2076 92F You can remove a secondary expander module from a 2076 92F expansion enclosure if it is faulty or to perform other service tasks 1 2 svc00983 Figure 92 Remove the drive assem...

Page 130: ...lty secondary expander module until its replacement is ready to be installed v Do not keep the cover off an operational enclosure for more than 15 minutes The reduction in airflow through the enclosure might cause the enclosure or its components to shut down to protect from overheating About this task The secondary expander modules provide SAS connectivity between the expansion canisters and the d...

Page 131: ...fy the operational status of the secondary expander modules Table 13 describes the function and status values of each LED indicator Table 13 LEDs on the secondary expander modules LED Color Status Description Power 1 Green On The secondary expander module is receiving power Off The secondary expander module is not receiving power svc01013 Figure 93 Location of secondary expander modules svc01068 1...

Page 132: ...ng the top cover 2076 92F on page 44 Procedure 1 Identify the secondary expander module to be replaced refer to Table 13 on page 107 2 Press the release buttons on top of the secondary expander module to release the handles 3 Rotate the handles outward to the unlocked position 4 Carefully lift the secondary expander module out of the enclosure as shown in Figure 95 Important To avoid electric shoc...

Page 133: ...ule or replace it with one from FRU stock follow the procedure in Installing or replacing a secondary expander module 2076 92F on page 74 Removing an expansion canister 2076 92F You can remove the expansion canisters in a 2076 92F expansion enclosure svc01020 Figure 96 Secondary expander module connectors svc01026 Figure 97 Secondary expander module removed from the enclosure Chapter 2 Installing ...

Page 134: ...expansion canisters has a failure the other expansion canister assumes the full I O load Figure 98 shows the features of an expansion enclosure 1 Canister fault indicator 2 Canister status 3 Canister power indicator 4 and 6 SAS link fault indicators 5 and 7 SAS link operational indicators 8 Canister release handles Procedure 1 Read all safety information 2 Locate the expansion canister to be remov...

Page 135: ... more than one fan module at a time v Remove a faulty fan module only when its replacement is ready to be installed v Do not remove a fan module from an operational enclosure for more than approximately 10 minutes The reduction in airflow through the enclosure might cause the enclosure or its components to shut down to protect from overheating About this task Note If you plan to remove the expansi...

Page 136: ...he release tab on the fan module as Figure 101 shows 3 Use the handle to pull the fan module out of the expansion enclosure chassis as shown in Figure 102 on page 113 svc01003 1 Figure 100 Fan module LED svc01030 Figure 101 Fan module release tab 112 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 137: ...expansion enclosure from a rack 2076 92F on page 92 Ensure that you use a lift to support the weight of the enclosure About this task The 2076 92F expansion enclosure contains two fan interface boards FIBs The FIBs act as the interface between the fans and the system drive board FIB 1 connects fan modules 1 and 2 to the drive board FIB 2 connects fan modules 3 and 4 If both fan modules controlled ...

Page 138: ...re on each side of the chassis Place the cover and cover screws in a safe location 2 Use a cross head screwdriver to loosen the retaining screws on the FIB as shown in Figure 105 on page 115 svc01003 1 Figure 103 Fan module LED svc01069 Figure 104 Location of the FIB cover 114 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 139: ...ut of the expansion enclosure chassis as shown in Figure 106 svc01029 Figure 105 Loosen the FIB screws svc01031 Figure 106 Remove the FIB from the chassis Chapter 2 Installing the Storwize V7000 Gen2 and Storwize V7000 Gen2 hardware 115 ...

Page 140: ...ing a fan interface board 2076 92F on page 89 Replacing an enclosure 2076 92F You can replace a faulty enclosure FRU 01LJ112 of a 2076 92F expansion enclosure with a new one from FRU stock Before you begin DANGER Multiple power cords The product might be equipped with multiple power cords To remove all hazardous voltages disconnect all power cords L003 L003 1 3 2 4 or sv100128 svc01019 Figure 107 ...

Page 141: ...76 92F on page 82 Power supply units Removing a power supply 2076 92F on page 100 Secondary expander modules Removing a secondary expander module 2076 92F on page 105 Expansion canisters Removing an expansion canister 2076 92F on page 109 Fan modules Removing a fan module 2076 92F on page 111 v The expansion enclosure was removed from the rack as described in Removing an expansion enclosure from a...

Page 142: ... install the parts in any order Important Ensure that a mechanical lift is available and in place to support the additional weight as the FRUs are reinstalled in the enclosure v Installing or replacing a power supply 2076 92F on page 79 v Installing or replacing a drive 2076 92F on page 69 v Installing or replacing a secondary expander module 2076 92F on page 74 v Installing or replacing an expans...

Page 143: ...l the display panel assembly shown in Figure 109 on page 120 out of the chassis svc01008 Figure 108 Removing the display panel assembly Chapter 2 Installing the Storwize V7000 Gen2 and Storwize V7000 Gen2 hardware 119 ...

Page 144: ...llow the procedure in Installing or replacing the display panel assembly 2076 92F Installing or replacing the display panel assembly 2076 92F You can replace the display panel assembly in a 2076 92F expansion enclosure svc01012 Figure 109 Display panel assembly 120 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 145: ...2076 92F on page 92 v The top cover was removed as described in Removing the top cover 2076 92F on page 44 v The display panel assembly was removed as described in Removing the display panel assembly 2076 92F on page 118 Procedure 1 Remove the display panel assembly which is shown in Figure 110 on page 122 from its packaging Chapter 2 Installing the Storwize V7000 Gen2 and Storwize V7000 Gen2 hard...

Page 146: ...nt of the expansion enclosure as shown in Figure 111 on page 123 Ensure the display panel assembly which is shown in Figure 110 faces toward the outside of the chassis svc01012 Figure 110 Display panel assembly 122 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 147: ...in Removing or moving the cable management arm 2076 92F on page 58 v The expansion enclosure has been removed from the rack as described in Removing an expansion enclosure from a rack 2076 92F on page 92 Procedure 1 Remove the two screws that attach the outer rail section to the front bracket assembly as shown in Figure 112 2 Remove the rail section by pulling it away from the front bracket as sho...

Page 148: ...92F expansion enclosure Note When you insert SAS cables ensure that the connector is oriented correctly to the control enclosure and expansion enclosure v For Storwize V7000 Gen2 or Storwize V7000 Gen2 control enclosures and 2145 24F or 2145 12F expansion enclosures the blue pull tab must be below the cable 1 in Figure 114 v For 2076 92F enclosures the blue pull tab must be above the connector 2 i...

Page 149: ...B ports USB ports can be used to initialize the system or to perform service related tasks by using a USB flash drive that contains executable files for initializing the system Fibre Channel and Fibre Channel over Ethernet FCoE ports If your system has an optionally installed Fibre Channel and FCoE adapter for host and external storage attachment ensure that these ports are accessible The nodes an...

Page 150: ...ight of 10 Combining 2U and 5U expansion enclosures About this task As Figure 115 shows you can combine 2145 24F 2145 12F and 2076 92F enclosures in a SAS chain The limiting factor is the combined chain weight of the various components The maximum SAS chain weight that can be attached to a node SAS port is 10 v 2076 92F enclosures have a chain weight of 2 5 v 2145 24F and 2145 12F enclosures have ...

Page 151: ...the 2U and 5U SAS enclosures differs Figure 116 shows the SAS ports on the 2076 92F 2145 12F and 2145 24F enclosures 1 Input SAS port 2 Output SAS port Powering on the expansion enclosure 2076 92F Use the following procedure to provide power to the 2076 92F expansion enclosure as part of the initial installation process or after a service procedure Before you begin Important 2 1 2 1 svc01057 1 2 1...

Page 152: ...As the figure also shows the PSUs are covered by the 1U fascia 5 1 Display panel LEDs 2 Rack retention thumb screws 3 Power supply unit LEDs 4 Power supply units PSUs 5 PSU fascia 1U 6 Front fascia 4U Each PSU has a power supply connector and power cable which are accessible from the back of the enclosure as shown in Figure 118 on page 129 Power is provided by plugging a C19 C20 power cable into e...

Page 153: ...agement arms When secured the power and SAS cables stay connected when you slide the expansion enclosure out of the rack to perform service tasks 3 Verify that the expansion enclosure and its components are operating as expected On the back of the expansion enclosure all four fans and the expansion canister indicators 3 and 8 in Figure 119 on page 130 become active when the power is connected 1 2 ...

Page 154: ...GUI view information about the system status and the expansion enclosure v If a new expansion enclosure was installed make sure that the enclosure was discovered by the system A newly recognized expansion enclosure is visible in the management GUI v If the expansion enclosure was powered off as part of a service procedure view the information in the management GUI to confirm that the enclosure is ...

Page 155: ...ives 4 Unplug both of the power cords from the rear of the expansion enclosure to remove all power from the enclosure Storwize V7000 2076 92F expansion enclosure LEDs and indicators The 2076 92F expansion enclosure has several sets of LEDs that provide information about the overall status of the enclosure power drives fans canisters and SAS connections A 2076 92F expansion enclosure has sets of LE...

Page 156: ...splay panel LEDs Function Color Status Description Power Green On The expansion enclosure power is on this LED is controlled by the expansion enclosure Off The expansion enclosure power is off Identify Blue On Identifies the expansion enclosure this LED is controlled by the system Use the management GUI or service interface to identify an enclosure Off The expansion enclosure is operating normally...

Page 157: ...re 1 as shown in Figure 124 on page 136 Table 16 Power supply unit LEDs Function Color Status Description 1 Input power Green On The input voltage is within specification Off No power input detected 2 DC power Green On DC power outputs are within specification Off DC power is not available 3 Fault Amber On A fault is detected in the PSU Off No faults are detected LEDs inside of the expansion enclo...

Page 158: ...ing and I O is occurring Off The drive is not installed or an installed drive is not ready to be used 3 Fault Amber On A fault occurred on the drive The LED is turned off when the drive is removed and replaced Flash The drive is being identified a fault might or might not be detected Off The installed drive is operating normally Figure 123 on page 135 shows the LEDs on a secondary expansion module...

Page 159: ...receiving power 2 Fault Amber On Not used Flash The secondary expansion module is being identified Off The secondary expansion module is operating normally LEDs on the rear of the expansion enclosure Figure 124 on page 136 shows the rear view of a 2076 92F expansion enclosure LEDs on the rear of the enclosure provide information about each fan module each expansion canister and SAS links svc01068 ...

Page 160: ...t of LEDs as shown in Figure 125 The LEDs provide status information about the expansion canister itself and the SAS connections 1 Canister fault 2 Canister status 3 Canister power 4 and 6 SAS link fault 5 and 7 SAS link operational 8 Canister release handles Table 19 on page 137 describes the values and meaning of each LED svc01010 8 7 7 8 1 2 4 5 3 6 9 Figure 124 LEDs on the back of the expansio...

Page 161: ...ote port One or more of the connected lanes are attached to a different address 5 and 7 SAS link operational Green Off No link connection on any lane The connection is down On The SAS link is active At least one of the four lanes is connected Connecting Ethernet cables to node canisters On Storwize V7000 systems the control enclosure has several Ethernet ports present or optionally present on the ...

Page 162: ...e extra iSCSI connectivity to the system Note Do not connect the Ethernet technician port labeled T to a network switch The technician port must only be directly connected to a personal computer when initializing a system or servicing a node Connecting Fibre Channel cables to a 10 Gbps iSCSI FCoE 4 port host interface adapter If 10 Gbps iSCSI FCoE 4 port host interface adapters are installed on yo...

Page 163: ...tructions on determining the number of cables required Note Both canisters must have the same number of cables connected Figure 128 shows an example configuration with two Fibre Channel cables connected to each canister 2 If you want to connect additional Fibre Channel cables make sure to connect the same number of cables to each canister Figure 129 on page 140 shows an example configuration with ...

Page 164: ...ller panels must be installed in all empty host interface adapter slots Open bays or slots disrupt the internal air flow causing the drives to receive insufficient cooling Procedure To power on the system complete the following steps 1 Power on all expansion enclosures Use the supplied power cords to connect both power supply units of the enclosure to their power sources If the power sources have ...

Page 165: ...re turned on The enclosure does not have power switches Note Each enclosure has two power supply units To provide power failure redundancy connect the two power cords to separate power circuits 5 From the rear of the control enclosure check the LEDs on each node canister see Figure 131 1 Power 2 Status 3 Fault The canister is ready with no critical errors when Power is illuminated Status is flashi...

Page 166: ...142 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 167: ... expansion enclosure to an existing system are described in Adding an expansion enclosure to an existing system on page 147 The steps for adding a control enclosure to an existing system are described in Adding a control enclosure to an existing system on page 148 Checking your web browser settings for the management GUI To access the management GUI you must ensure that your web browser is support...

Page 168: ...k OK to close Internet Options i Refresh your browser For Microsoft Internet Explorer IE running on Microsoft Windows Server 2008 a In Internet Explorer click Tools Internet Options b Click Security c Click Trusted sites d On the Trusted sites dialog verify that the web address for the management GUI is correct and click Add e Verify that the correct web address was added to the Trusted sites dial...

Page 169: ...ck the Internet zone d Click Custom level to customize the security level for this zone e Scroll down to Downloads and select Enable under File download f Click OK g Click Yes to confirm h Click OK to close the Internet Options For Microsoft Internet Explorer IE 11 and Microsoft Edge running on Microsoft Windows 10 file download is enabled by default and requires no additional configuration 4 Enab...

Page 170: ...orted browser that is installed on the personal computer v An Ethernet cable to connect the personal computer to the technician port Attention Do not connect the technician port to a switch If a switch is detected the technician port connection might shut down causing a 746 node error Procedure To initialize the system complete the following steps 1 Ensure that the system is powered on as describe...

Page 171: ...alization tool to configure the system with a name and management IP address 7 If you experience a problem during the process due to a change in system states wait 5 10 seconds Then either reopen the SSH connection or reload the service assistant 8 After you complete the initialization process disconnect the cable between the personal computer and the technician port What to do next The system can...

Page 172: ...e the initialization tool Procedure To add a control enclosure to an existing system complete the following steps 1 Install support rails for the new enclosure 2 Install the new enclosure in the rack 3 Connect the canisters to the storage area network See Connecting Fibre Channel cables to a 10 Gbps iSCSI FCoE 4 port host interface adapter on page 138 or Connecting Fibre Channel cables to a Fibre ...

Page 173: ...rts and connectors The Storwize V7000 online documentation and its related publications are accessibility enabled The accessibility features of the online documentation are described in Viewing information in the information center Keyboard navigation You can use keys or key combinations to perform operations and initiate menu actions that can also be done through mouse actions You can navigate th...

Page 174: ...150 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 175: ...d Warranty is available in both hardcopy format and in the Storwize V7000 IBM Knowledge Center The Statement of Limited Warranty is included in hardcopy form with your product It can also be ordered from IBM see Table 2 on page xx for the part number Copyright IBM Corp 2014 2017 151 ...

Page 176: ...152 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 177: ...r of Licensing IBM Corporation North Castle Drive Armonk NY 10504 1785 U S A For license inquiries regarding double byte character set DBCS information contact the IBM Intellectual Property Department in your country or send inquiries in writing to Intellectual Property Licensing Legal and Intellectual Property Law IBM Japan Ltd 19 21 Nihonbashi Hakozakicho Chuo ku Tokyo 103 8510 Japan INTERNATION...

Page 178: ...ents or other publicly available sources IBM has not tested those products and cannot confirm the accuracy of performance compatibility or any other claims related to non IBM products Questions on the capabilities of non IBM products should be addressed to the suppliers of those products Statements regarding IBM s future direction or intent are subject to change or withdrawal without notice and re...

Page 179: ... a registered trademark of Linus Torvalds in the United States other countries or both Microsoft Windows and the Windows logo are trademarks of Microsoft Corporation in the United States other countries or both Other product and service names might be trademarks of IBM or other companies Homologation statement This product may not be certified in your country for connection by any means whatsoever...

Page 180: ...otection requirements of European Union EU Council Directive 2004 108 EC on the approximation of the laws of the Member States relating to electromagnetic compatibility IBM cannot accept responsibility for any failure to satisfy the protection requirements resulting from a non recommended modification of the product including the fitting of non IBM option cards Attention This is an EN 55022 Class ...

Page 181: ...on Geräten EMVG Dies ist die Umsetzung der EU Richtlinie 2004 108 EG in der Bundesrepublik Deutschland Zulassungsbescheinigung laut dem Deutschen Gesetz über die elektromagnetische Verträglichkeit von Geräten EMVG bzw der EMC EG Richtlinie 2004 108 EG für Geräte der Klasse A Dieses Gerät ist berechtigt in übereinstimmung mit dem Deutschen EMVG das EG Konformitätszeichen CE zu führen Verantwortlich...

Page 182: ...terference Class A statement This explains the Japan Voluntary Control Council for Interference VCCI statement Japan Electronics and Information Technology Industries Association Statement This statement explains the Japan JIS C 61000 3 2 product wattage compliance This statement explains the Japan Electronics and Information Technology Industries Association JEITA statement for products less than...

Page 183: ...roducts greater than 20 A per phase three phase Korean Electromagnetic Interference EMI Statement This explains the Korean Electromagnetic Interference EMI statement Russia Electromagnetic Interference Class A Statement This statement explains the Russia Electromagnetic Interference EMI statement 0 1234567 0 48 9 4ABCD rusemi Notices 159 ...

Page 184: ...160 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...

Page 185: ...37 ports 7 switch 137 138 European Union EU EMC Directive conformance statement 156 expansion canister 2076 92F 131 data ports 8 LEDs 131 140 expansion enclosure adding to an existing system 147 attachment cables 23 25 124 installing 21 location guidelines 11 power cords 140 rails 17 expansion enclosure SAS cable 2076 92F 85 replacing 85 F FCC Federal Communications Commission electronic emission ...

Page 186: ...ver2076 92F 68 replacing2076 92F 79 S safety ix caution notices x danger notices xiv environmental notices ix safety information labels ix safety notices ix SAS cables 23 25 124 send a comment xxi shortcut keys keyboard 149 Statement of Limited Warranty 151 static sensitive devices xviii Storwize V7000 safety notices x xiv Storwize V7000 library related publications xix superuser 146 support rails...

Page 187: ......

Page 188: ...IBM Printed in USA GC27 6500 08 ...

Reviews: