Chapter 2. Installing the Storwize V7000 Gen2 and Storwize
V7000 Gen2+ hardware
After verification that you have all of the hardware components that you require,
you can install them.
You completed the initial steps of verifying the shipping contents and becoming
familiar with the hardware components. You verified that the power and
environmental requirements are met and planned the location of the enclosures.
You are now ready to begin installing the hardware components and connecting
the data cables and power cords.
Installing support rails for the Storwize V7000 Gen2 and Storwize
V7000 Gen2+ control enclosure
Before you install the control enclosure, you must first install the support rails for
it.
Procedure
To install the support rails for the control enclosure, complete the following steps.
1.
Locate the control enclosure rails (Figure 8). The rail assembly consists of two
rails that must be installed in the rack cabinet.
2.
Install a spring on each rail.
a.
Extend the rail to its full length.
b.
Push one looped end of a spring over one stud on the inside of the rail.
Note:
Some models of rail have the studs on the outside of the rail.
fab10051
Figure 8. Control enclosure support rails
© Copyright IBM Corp. 2014, 2017
13
Summary of Contents for StorVize V7000 Gen2
Page 8: ...viii Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...
Page 24: ...xxiv Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...
Page 36: ...12 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...
Page 166: ...142 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...
Page 174: ...150 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...
Page 176: ...152 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...
Page 184: ...160 Storwize V7000 Gen2 and Gen2 Quick Installation Guide ...
Page 187: ......
Page 188: ...IBM Printed in USA GC27 6500 08 ...