background image

Setup overview for the N7700/N7900 gateway

Prepare for connectivity between gateways
and storage subsystems, including the
following tasks:

Creating LUNs on the storage subsystem
Setting LUN security, as appropriate
Exporting (mapping) the LUNs to the
targeted ports for the gateways

Installing the gateway in a rack

Connecting your gateway to a storage
subsystem

Connecting your gateway to create a cluster
failover pair

Connecting your gateway to a network,
ASCII terminal, and any third-party tape
backup devices, and then powering on and
booting in regular mode

Performing basic setup and configuration of
the gateway software, including:

Specifying the LUNs on the storage
subsystem that the gateway can access
Providing system information for the
gateway, such as IP address and media
type
Installing an NFS or a CFS license
Installing the Data ONTAP   software

Configuring Data ONTAP features that you
want to use with your gateway

!

!

!

!

!

!

!

Setup task:

Refer to the following:

- Gateway Implementation Guide

for your

storage subsystem type

- Gateway Implementation Guide

for your

storage subsystem type

- Gateway Implementation Guide

for your

storage subsystem type

-

Gateway Software Setup, Installation, and

Management Guide

-

This document

-

- Gateway Implementation Guide

Storage subsystem documentation

for your

storage subsystem type

-

Data ONTAP documentation library

Gateway Software Setup, Installation, and

Management Guide

-

15

For a complete list of all Data ONTAP gateway publications, see Appendix I, “IBM System
Storage N series documentation,” in the

, GA32-0543

IBM System Storage N series Introduction and

Planning Guide

Introduction and Planning Guide

. The latest version of the

and

other N series documentation is available at the following Web site:

www. ibm.com/storage/support/nas

Summary of Contents for System Storage N7000

Page 1: ...N7000 Series Gateway Installation and Setup Instructions IBM System Storage...

Page 2: ......

Page 3: ...NFS client Where is the NAS system located Text string Do you want to run DNS resolver Do you want to run NIS client Would you like to configure the RLM LAN interface y RLM IP Address RLM Netmask RLM...

Page 4: ......

Page 5: ...eries Hardware and Service Guide Need help If you encounter any difficulties while setting up your system contact IBM service and support for assistance Information can also be found at the following...

Page 6: ...ic models Note Lift box from crate The contents will remain in place Note Eight Small Form Factor Pluggable SFP modules will either be in the accessory box or will be installed on the fiber ports of t...

Page 7: ...one envelope with the software EULA and license keys 2 N7700 N7900 1 Console adapter RJ 45 to DB 9 2 IBM rail kit 1 Serial null modem cable 2 Cable management tray 2 ESD wrist strap 4 Power cords 1 P...

Page 8: ...that the N7700 N7900 be placed in the lowest position available in a rack For example Gateway 2 Gateway 1 N7700 N7900 N7700 N7900 A21 A21 Model A11 Model A21 Expansion Unit 2 Expansion Unit 1 Filer 2...

Page 9: ...ine up with the bottom EIA boundary When installed each N7700 N7900 unit will occupy a 6U space Using two silver pan head M5 screws attach the rail to the front of the rack using holes H2 and H8 Tight...

Page 10: ...f you are installing a second N7700 N7900 Section of rack EIA rail H2 H1 H3 H4 H5 H6 H7 H8 H9 Locating pins Bottom rail screws REAR Left and Right Rails Chassis attach screw H2 H1 H3 H4 H5 H6 H7 H8 H9...

Page 11: ...the system unit 2 Power supplies 5 Fan modules Bezel 2 3 2 Carefully remove the front bezel of the N7700 N7900 gateway by pulling out on the semi circular openings on either side of the bezel Caution...

Page 12: ...that you support the fan with your free hand After removing each fan place it on a table or other safe place 3 4 Remove the two power supplies from the rear of the system unit by performing the follo...

Page 13: ...teway system unit by performing the following steps 1 Align the edges of the power supply with the opening in the system chassis and gently push the power supply into the chassis until the cam handle...

Page 14: ...ear of the rack attach the rear tie down bracket in the orientation shown to the rails using four M5 flat head screws The tie down bracket should be over the rear of the system unit Tie down bracket M...

Page 15: ...go to step 6 on page 13 If you are installing a model A21 go to step 5 on page 12 4 2 4 2 I0I0 0a 0b 0c 0d 0e 0f 0g 0h RLM e0e e0f e0a e0b e0c e0d 11 4 4 4 1 4 2 Install your cable management tray by...

Page 16: ...ight 5 1 1 Plug one end of the cluster cable into one of gateway 1 s cluster adapter ports Then plug the other end into gateway 2 s corresponding cluster adapter port You must not cross cable the clus...

Page 17: ...n below power supply 1 and power supply 2 6 2 Connect the power cords to the power sources making sure that the This ensures redundant power power supplies on the left and right sides of the system ar...

Page 18: ...iguration rules for setting up the storage subsystem Determining whether to use SyncMirror for additional RAID level data protection Creating a document that shows the desired logical configuration be...

Page 19: ...ia type Installing an NFS or a CFS license Installing the Data ONTAP software Configuring Data ONTAP features that you want to use with your gateway Setup task Refer to the following Gateway Implement...

Page 20: ...publication to IBM products or services do not imply that IBM intends to make them available in every country or region IBM the IBM logo and System Storage are trademarks or registered trademarks of...

Reviews: