Replacing a hot-swap power supply
After you replace a power supply, verify that the power-supply status indicators (AC
Power LED and DC Power LED) are on, indicating that the power supply is
operating properly.
Notes:
1. You do not need to switch off the power to the appliance to install hot-swap
power supplies.
2. When replacing a power supply, do not remove the power supply until you are
ready to install its replacement.
To replace a hot-swap power supply:
1. Remove the power supply that you want to replace.
2. Install the replacement power supply in the bay:
a. Place the handle on the power supply in the open position (that is,
perpendicular to the power supply) and slide the power supply into the
chassis.
b. Gently close the handle to seat the power supply in the bay.
3. Plug the power cord for the power supply you just installed into the power cord
connector.
4. Route the power cord through the cable-restraint bracket.
5. Plug the power cord into a properly grounded electrical outlet.
6. Verify that the DC Power LED and AC Power LED on the power supply are on,
indicating that the power supply is operating correctly.
Figure 34. Installing a hot-swap power supply
Chapter 3. Adding and replacing components
51
Summary of Contents for totalstorage 200
Page 1: ...IBM TotalStorage Network Attached Storage 200 Models 200 and 225 Hardware Installation Guide ...
Page 2: ......
Page 3: ...IBM TotalStorage Network Attached Storage 200 Models 200 and 225 Hardware Installation Guide ...
Page 8: ...vi IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Page 10: ...viii IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Page 14: ...xii IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Page 18: ...4 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Page 40: ...26 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Page 86: ...72 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Page 99: ...Appendix B Safety and environmental notices 85 ...
Page 100: ...86 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Page 101: ...Appendix B Safety and environmental notices 87 ...
Page 102: ...88 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Page 103: ...Appendix B Safety and environmental notices 89 ...
Page 104: ...90 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Page 117: ...Appendix B Safety and environmental notices 103 ...
Page 130: ...116 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Page 144: ...130 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Page 147: ...warranty statement 119 Index 133 ...
Page 148: ...134 IBM TotalStorage Network Attached Storage 200 Installation Guide ...
Page 151: ......