R
rack
installing the switch in
16
mount kit
17, 18
mount slide
18, 19, 20, 21
specifications
34
radio interference
56
reader comment form processing
xix
recycling products
xiv
regulatory compliance
43
regulatory specifications
38
related documents
xvii
reliability features
13
removing an SFP
31
replacing an SFP
31
restrictions, usage
xiv
routing tables
11
running a POST
28
running diagnostic tests
29
S
safety
and environmental notices
xi, xiv
and installation considerations
15
certifications
43
inspections
xi
labels check
xii, xiii
laser caution notice
xiv
notices, translations
xi
sending your comments
xix
serial port specifications
37
serial ports
7
service functions
11
SES management interface
14
SFP
installing
32
label
xii
removing
31
replacing
31
simple network management protocol (SNMP)
11
slide, rack mount
18, 19, 20, 21
SNMP (simple network management protocol)
11
SNMP management interface
14
software specifications
8
software, getting updates
xix
specifications
EIA rack
34
environmental
36
facility
33
general
34
memory
37
optical port
37
physical
35
power supply
36
regulatory
38
serial port
37
software
8
speed LEDs
Ethernet
25
speed LEDs (continued)
port
25, 27
speed negotiation, auto-sensing
9
stand-alone unit, installing the switch as
16
standards compliance
41
statements
Chinese class A compliance
57
European Community compliance
57
Federal Communications Commission (FCC)
56
Germany compliance
58
Industry Canada compliance
56
Japanese Voluntary Control Council for Interference
(VCCI) class 1
58
Korean Government Ministry of Communication
(MOC)
59
safety and environmental notices
xi, xiv
Taiwan class A compliance
59
status LEDs
Ethernet
25, 27
policies
24
port
25, 27
switch
25, 26, 28
subsystem, CPU
3
supply, power
8
support
for FC-IP
42
for Fibre Channel ports
41
for Fibre Channel protocol
42
hardware
12
operating system
13
switch
accessing
23
air flow
15
back panel
2
components
2, 33
configuring
21, 22
connecting
23
depth
35
disposal
xv
front panel
2
hardware components
3
height
35
implementation in existing environments
12
installing
as a stand-alone unit
16
in an EIA rack
16
interoperability
12
interpreting LED activity
21
LEDs
1, 2, 33
management interfaces
14
managing
14
operating
25
operating temperature
36
package
1
ports
1, 33
POST, interpreting
28
rack mount kit
17, 18
recycling
xiv
specifications
EIA rack
34
environmental
36
76
IBM TotalStorage SAN Switch: 3534 Model F08 Installation and User’s Guide
Summary of Contents for TotalStorage 3534-F08
Page 2: ......
Page 3: ...IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide GC26 7559 00...
Page 8: ...vi IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 10: ...viii IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 12: ...x IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 18: ...xvi IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 22: ...xx IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 62: ...40 IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 82: ...60 IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 94: ...72 IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 100: ...78 IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...
Page 103: ......
Page 104: ...Part Number 17P7301 Printed in U S A GC26 7559 00 1P P N 17P7301...
Page 105: ...Spine information IBM TotalStorage SAN Switch 3534 Model F08 Installation and User s Guide...