shows
the
location
of
the
lever
and
latches.
Lever
Latches
f10ug018
2.
Carefully
pull
on
the
connector
to
remove
it.
Make
sure
you
grasp
the
connector
and
not
the
cable
when
removing
the
LC-LC
cable
from
the
LC-SC
cable
adapter
as
shown
in
f10ug015
3.
Replace
the
protective
caps
on
the
cable
ends.
Connecting
hosts
to
the
RAID
controllers
To
connect
a
host
adapter
to
the
RAID
controller,
perform
the
following
steps:
1.
Install
an
SFP
in
a
host
port
on
the
RAID
controller.
2.
Connect
the
host-system
cables
to
the
RAID
controller
or
to
switches.
shows
the
location
on
the
RAID
controllers
where
the
host-system
cables
connect.
Figure
42.
LC-LC
fibre-channel
cable
lever
and
latches
Figure
43.
Removing
the
LC-LC
fibre-channel
cable
from
an
LC-SC
fibre-channel
cable
adapter
Chapter
3.
Cabling
the
storage
server
49
Summary of Contents for totalstorage fastt100
Page 2: ......
Page 10: ...viii IBM TotalStorage FAStT100 Storage Server Installation User s and Maintenance Guide ...
Page 14: ...xii IBM TotalStorage FAStT100 Storage Server Installation User s and Maintenance Guide ...
Page 18: ...xvi IBM TotalStorage FAStT100 Storage Server Installation User s and Maintenance Guide ...
Page 30: ...xxviii IBM TotalStorage FAStT100 Storage Server Installation User s and Maintenance Guide ...
Page 68: ...38 IBM TotalStorage FAStT100 Storage Server Installation User s and Maintenance Guide ...
Page 86: ...56 IBM TotalStorage FAStT100 Storage Server Installation User s and Maintenance Guide ...
Page 124: ...94 IBM TotalStorage FAStT100 Storage Server Installation User s and Maintenance Guide ...
Page 132: ...102 IBM TotalStorage FAStT100 Storage Server Installation User s and Maintenance Guide ...
Page 134: ...104 IBM TotalStorage FAStT100 Storage Server Installation User s and Maintenance Guide ...
Page 138: ...108 IBM TotalStorage FAStT100 Storage Server Installation User s and Maintenance Guide ...
Page 159: ......
Page 160: ... Part Number 24P8970 Printed in USA GC26 7641 00 1P P N 24P8970 ...