Step 5: Verify correct engine operation
Wait approximately 5 minutes after powering on for the initial diagnostics to
complete. Verify that the LEDs are on as shown in the following figure. If not,
refer to the User’s Reference on the Documentation CD.
TX
RX
OK
1
blinking
on
IBM TotalStorage
™
NAS Gateway 300 Model G27 Quick Start Instructions
5