Table 10. Firmware checkpoints (continued)
Checkpoint
Description
Action or
possible failing FRU
E54A
Configure the I/O drawer
1. Check the RIO cable specified by the
location code. If the location code
specifies an I/O subsystem or its RIO
interface, check the RIO cables going
into and out of the I/O subsystem.
2. Replace the RIO cables specified by
the location code. If the location code
specifies an I/O subsystem or its RIO
interface, replace the RIO cables going
into and out of the I/O subsystem.
3. Replace the I/O subsystem backplane
specified by the location code, or the
I/O subsystem backplane that the RIO
cables in step 1 are attached to.
E54B
Update the I/O drawer routing table of RIO
ports
1. Check the RIO cable specified by the
location code. If the location code
specifies an I/O subsystem or its RIO
interface, check the RIO cables going
into and out of the I/O subsystem.
2. Replace the RIO cables specified by
the location code. If the location code
specifies an I/O subsystem or its RIO
interface, replace the RIO cables going
into and out of the I/O subsystem.
3. Replace the I/O subsystem backplane
specified by the location code, or the
I/O subsystem backplane that the RIO
cables in step 1 are attached to.
E550
Begin to initialize RIO interface chip
Replace the device specified by the
location code.
E551
Set up the RIO speed
Replace the device specified by the
location code.
E552
Set up RIO interface chip registers
Replace the device specified by the
location code.
E553
Set up the RIO interface chip base address Replace the device specified by the
location code.
E554
Set up more RIO interface chip registers
Replace the device specified by the
location code.
E555
Set up the RIO interface chip RIO link
Replace the device specified by the
location code.
E556
Set up and initialize RIO interface chips
under current RIO interface chip
Replace the device specified by the
location code.
E55F
End of I/O drawer initialization
Replace the device specified by the
location code.
E560
Begin initializing the I/O drawer
1. Check for system firmware updates.
2. Go to “MAP 1540: Problem Isolation
Procedures” on page 69.
Chapter 4. Checkpoints
111
Summary of Contents for TotalStorage NAS Gateway 500
Page 1: ...IBM TotalStorage NAS Gateway 500 Service Guide GY27 0418 00 ...
Page 2: ......
Page 3: ...IBM TotalStorage NAS Gateway 500 Service Guide GY27 0418 00 ...
Page 16: ...xiv NAS Gateway 500 Service Guide ...
Page 20: ...xviii NAS Gateway 500 Service Guide ...
Page 36: ...System logic flow Note Not all components are supported 16 NAS Gateway 500 Service Guide ...
Page 52: ...32 NAS Gateway 500 Service Guide ...
Page 58: ...38 NAS Gateway 500 Service Guide ...
Page 112: ...92 NAS Gateway 500 Service Guide ...
Page 266: ...246 NAS Gateway 500 Service Guide ...
Page 326: ...306 NAS Gateway 500 Service Guide ...
Page 353: ...Chapter 11 Removal and replacement procedures 333 ...
Page 392: ...372 NAS Gateway 500 Service Guide ...
Page 402: ...382 NAS Gateway 500 Service Guide ...
Page 412: ...392 NAS Gateway 500 Service Guide ...
Page 440: ...420 NAS Gateway 500 Service Guide ...
Page 446: ...426 NAS Gateway 500 Service Guide ...
Page 448: ...428 NAS Gateway 500 Service Guide ...
Page 466: ...446 NAS Gateway 500 Service Guide ...
Page 469: ......
Page 470: ... Printed in U S A GY27 0418 00 ...
Page 471: ...Spine information IBM TotalStorage NAS Gateway 500 NAS Gateway 500 Service Guide GY27 0418 00 ...