Ensure that all devices, shelves, drawers, doors, and cables are secure.
Ensure that the four leveling pads are raised to their highest position.
Ensure that no stabilizer bracket is installed on the rack cabinet during movement.
Do not use a ramp that is inclined at more than 10 degrees.
When the rack cabinet is in the new location, complete these steps.
Lower the four leveling pads.
Install stabilizer brackets on the rack cabinet or in an earthquake environment bolt the rack to the floor.
If you removed any devices from the rack cabinet, repopulate the rack cabinet from the lowest position to the highest position.
If a long-distance relocation is required, restore the rack cabinet to the configuration of the rack cabinet as you received it. Pack the rack cabinet in the
original packaging material, or equivalent. Also, lower the leveling pads to raise the casters off the pallet and bolt the rack cabinet to the pallet. (R002)
DANGER
Racks with a total weight of > 227 kg (500 lb.), Use Only Professional Movers! (R003)
Caution
Rack is not intended to serve as an enclosure and does not provide any degrees of protection required of enclosures.
It is intended that equipment installed within this rack will have its own enclosure. (R005)
Tighten the stabilizer brackets until they are flush against the rack. (R006)
Use safe practices when lifting. (R007)
Do not place any object on top of a rack-mounted device unless that rack-mounted device is intended for use as a shelf. (R008)
If the rack is designed to be coupled to another rack only the same model rack should be coupled together with another same model rack. (R009)
Danger
Main Protective Earth (Ground): This symbol is marked on the frame of the rack. The PROTECTIVE EARTHING CONDUCTORS must be terminated at that point. A
recognized or certified closed loop connector (ring terminal) must be used and secured to the frame with a lock washer using a boltor stud. The connector must be
properly sized to be suitable for the bolt or stud, the locking washer, the rating for the conducting wire used, and the considered rating of the breaker. The intent is
to ensure the frame is electrically bonded to the PROTECTIVE EARTHING CONDUCTORS. The hole that the bolt or stud goes into where the terminal connector and
the lock washer contact must be free of any non-conductive material to allow for metal to metal contact. All PROTECTIVE BONDING CONDUCTORS must terminate
at this main protective earthing terminal or at points marked with
. (R010)
Always ensure that a load of 95 kg (210 lb) is inside the bottom of the rack (compliance ID RR001), especially before relocating or servicing units with their Center
of Gravity (CoG) higher than 22U. (R011)
Verify kit contents
Before you begin, verify that your kit is complete.
Qty
Description
1
Fixed shelf
4
Screws
2
Tie wraps
Installation Instructions (Feature 7003)
Tools required
Verify that you have the tools necessary for the procedure.
7 mm nut driver or 7 mm socket wrench