Page 40
Basic Handbook for the IBM WorkPad
To receive beamed information:
1. Turn on your WorkPad.
2. Point the IR port directly at the IR port of the transmitting
WorkPad to open the Beam Status dialog.
3. Tap the Yes button to accept the transmission.
4. Wait for the Beam Status dialog to indicate that the transfer is
complete, and then tap the OK button to display the new entry.
Note:
Incoming entries are filed under the “Unfiled” category.