Page 2
Verification of Checks and repairs
SITTA
Serial number: ……………………….……………
First check by ICARO / date: ….…………………
………………………….
Name/ Stamp
Check (C)
Repair (R)
Which repair/ Check?
Check valid until?
Performed by/ date
Measured porosity data
Measured data of the lines
Estimated condition
optical:
technical:
Check (C)
Repair (R)
Which repair/ Check?
Check valid until?
Performed by/ date
Measured porosity data
Measured data of the lines
Estimated condition
optical:
technical:
Check (C)
Repair (R)
Which repair/ Check?
Check valid until?
Performed by/ date
Measured porosity data
Measured data of the lines
Estimated condition
optical:
technical:
Version 1/ 2015 ©
Summary of Contents for Sitta
Page 1: ...Page 1 VERSION 2 0 2015...
Page 22: ...Page 22...