11
BOILER INSTALLATION
XP XWH BOILER INSTALLATION
Follow directions under general guidance for connecting module to
the Energy Management System and power. This section will guide
the installer on how to mount and connect the module to the boiler.
Open the door on the low voltage wiring box on the back side of the
heater to see the terminal strip where to connect the gateway to the
boiler as shown in
)LJXUH
Figure 33. Boiler Terminal Strip
Inside the cover of the box shows the wiring legend for the terminal
VWULSVHH
)LJXUH
).
Figure 34. Terminal Strip Wiring Legend
Place the Gateway on top of the heater or conveniently nearby.
Locate a knock out on the right side of the low voltage box to run
the communication cable through to the inside of the low voltage
box.
The boiler does not have an RJ-45 connector as do the water heaters
to connect Port A of the gateway, so the plug on the other end of the
communications cable must also be cut off with a wire cutter. Locate
DQGVWULSWKHLQVXODWLRQòLQFKIURPWKHEURZQEURZQZKLWHDQGEOXH
ZKLWHZLUHV&RQQHFWWKHEURZQZKLWHZLUHWR&20B$WKHEURZQ
ZLUHWR&20B%DQGWKHEOXHZKLWHZLUHWR&20B&
Summary of Contents for 100316044
Page 53: ...53 NOTES NOTES ...