ELEVATION SERIES CIM CUBERS
SEQUENCE OF OPERATIONS
15
CONTROL BOARD - PRE-CHILL
The Compressor and Fan(s)/Liquid Line Solenoid (R1 and R2 LED’s on Board illuminated) are energized
and unit is now in a Pre‐Chill for 30 seconds bringing the Evaporator temperature down. Both Curtain
Switch LED’s are on showing closed curtain(s). Even though (R1) is energized the Fan Motor will only
come on once the Fan Cycle Switch closes at 250 psi of head pressure.
BROWN
BLUE
VIOLET
BLACK
RED
TAN
PINK
YELLOW
= Illuminated LED
WHITE
WHITE
BLUE w/ WHITE
BLUE w/ RED
BLUE
12V DC Switches
Line Voltage
Components
R1
R2
R3
R4
R5
R6
Summary of Contents for CIM Series
Page 31: ...ELEVATION SERIES CIM CUBERS BOARD COMPONENT LED SEQUENCE 29 INITIAL HARVEST CYCLE AT START UP ...
Page 32: ...ELEVATION SERIES CIM CUBERS BOARD COMPONENT LED SEQUENCE 30 TRANSITION FROM HARVEST TO FREEZE ...
Page 33: ...ELEVATION SERIES CIM CUBERS BOARD COMPONENT LED SEQUENCE 31 BIN FULL CURTAIN OR STAT ...
Page 35: ...ELEVATION SERIES CIM CUBERS BOARD COMPONENT LED SEQUENCE 33 DIAGNOSTICS IN HARVEST CYCLE ...
Page 36: ...ELEVATION SERIES CIM CUBERS BUTTON FUNCTIONS 34 Button Functions ...