ELEVATION SERIES CIM CUBER
PURGE VALVE
47
Purge Valve
Operation
The Purge Valve is located in the back of the Evaporator. The Valve should open when energized
by Relay 5 on the Board (LED ON) during the Harvest Cycle to help empty the mineral laden
water (see Sequence of Operation pg. 9) and during the Cleaning/Sanitizing Cycle (see Cleaning
Instructions pg. 56).
Troubleshooting
The Purge Valve is located in the back of the Evaporator. The Valve should open when energized
by Relay 5 on the Board (LED ON) during the Harvest Cycle to help empty the mineral laden
water and during the Cleaning/Sanitizing Cycle. If Purge Valve fails to open with Relay 5 LED illu‐
minated, unplug Connector at coil of Valve and check for line voltage. If none is found, check
output voltage at Molex at Board between Pink and Blue wires. If no voltage is found, the Board
is the issue. If output voltage is found, wiring between Molex and connector at Valve is the issue.
Voltage can also be verified at the connector at the coil on the Purge Valve.
R1
R2
R3
R4
R5
R6
L2/N
L1
Summary of Contents for CIM2046
Page 31: ...ELEVATION SERIES CIM CUBERS BOARD COMPONENT LED SEQUENCE 29 INITIAL HARVEST CYCLE AT START UP...
Page 32: ...ELEVATION SERIES CIM CUBERS BOARD COMPONENT LED SEQUENCE 30 TRANSITION FROM HARVEST TO FREEZE...
Page 33: ...ELEVATION SERIES CIM CUBERS BOARD COMPONENT LED SEQUENCE 31 BIN FULL CURTAIN OR STAT...
Page 35: ...ELEVATION SERIES CIM CUBERS BOARD COMPONENT LED SEQUENCE 33 DIAGNOSTICS IN HARVEST CYCLE...
Page 36: ...ELEVATION SERIES CIM CUBERS BUTTON FUNCTIONS 34 Button Functions...