Installation ICEU060
Page 5
Final Check:
1. Is the cabinet level?
2. Have all the electrical and piping connection been made?
3. Has the voltage been tested and checked against the nameplate rating?
4. Is the unit plugged into a separate electrical circuit?
5. Is the water supply line shut off valve installed and is the water turned on?
6. Have the bin interior and cabinet exterior been wiped clean?
7. Are all internal components in place including spray platform and curtain?
8. Have the internal refrigerant lines been checked for rubbing and chaffing?
9. Has the machine been installed indoors, in a controlled environment with adequate air
circulation around the machine, and where it can be serviced?