24
STEP 17:
Lay the (2C) left and (2D) right Towers on their backs. At the bottom of the (2C) left tower should be
one network cord and two DC connections (one small, one large). Carefully pull them out and
ensure no damage has been done to the network cable. At the bottom of the (2D) right tower should
be two network cords and two DC connections (one small, one large). Carefully pull them out and
ensure no damage has been done to the network cables. It might be possible that the network
cables can “catch” on internal wiring inside the towers. Wiggle the cable up, down, back and fourth
until it is free.
Summary of Contents for DB1100X
Page 7: ...7 Assembly for Steps 1 9 Chapter 1...
Page 16: ...16 Assembly for Steps 9 16 Chapter 2...
Page 22: ...22 Assembly for Steps 17 22 Chapter 3...
Page 28: ...28 Assembly for Steps 23 26 Chapter 4...
Page 33: ...33 Assembly for Steps 28 46 Chapter 5...
Page 44: ...44 Assembly for Steps 47 54 Chapter 6...
Page 49: ...49 STEP 52 Tower harnesses Insert cables from each tower assembly into the bottom holes B...
Page 53: ...53 Assembly for Steps 55 58 Chapter 7 HARDWARE NEEDED AA0655 8 X 3 4 Square pan head QTY6...
Page 54: ...54 Parts Needed Pallet 2 loose 2F...
Page 58: ...58 Chapter 8 Assembly for Steps 59 72...
Page 84: ...84 Tower Covers Part Numbers...
Page 85: ...85 DECAL PART NUMBERS...
Page 91: ...91 DB3277X ball gate Assembly NS1022 P802 black NS1022 P509 blue ZS2015X Actuator...