27
STEP 21:
Position 2A inner tower to the left and 2B
inner tower to the right at the back of the
cabinet. Align the hole at the bottom of the
towers with the holes already at the back.
STEP 22:
Secure each of the inner towers using four AA6584 black Allen bolts and AA6212 black washers.
Do not install tower covers at this time.
AA6212 1/4 X 3/4 FLAT
WASHER BLACK
AA6584 1/4-20 X 2 (BLACK)
X’s 4
T-Molding goes to the bottom!
Towers Assembled
Summary of Contents for DB1100X
Page 7: ...7 Assembly for Steps 1 9 Chapter 1...
Page 16: ...16 Assembly for Steps 9 16 Chapter 2...
Page 22: ...22 Assembly for Steps 17 22 Chapter 3...
Page 28: ...28 Assembly for Steps 23 26 Chapter 4...
Page 33: ...33 Assembly for Steps 28 46 Chapter 5...
Page 44: ...44 Assembly for Steps 47 54 Chapter 6...
Page 49: ...49 STEP 52 Tower harnesses Insert cables from each tower assembly into the bottom holes B...
Page 53: ...53 Assembly for Steps 55 58 Chapter 7 HARDWARE NEEDED AA0655 8 X 3 4 Square pan head QTY6...
Page 54: ...54 Parts Needed Pallet 2 loose 2F...
Page 58: ...58 Chapter 8 Assembly for Steps 59 72...
Page 84: ...84 Tower Covers Part Numbers...
Page 85: ...85 DECAL PART NUMBERS...
Page 91: ...91 DB3277X ball gate Assembly NS1022 P802 black NS1022 P509 blue ZS2015X Actuator...