50
STEP 53: NETWORK CABLE FLOW
The Network cable run starts from front of game to first coupler at the back. The other side of the
coupler goes up the left score tower and back down into another coupler. Each tower has two
network cables. Each coupler and cable is colored coded.
Either one can be used for input or output.
DO NOT PLUG BOTH CABLES FROM A TOWER INTO THE SAME COUPLER!
Two pin DC power cables are also at each
tower connection
Connect the display harness coming
from the center tower.
Direction of network.
Not physical connections.
Any cable with the same color can be plugged into same color coupler.
Summary of Contents for DB1100X
Page 7: ...7 Assembly for Steps 1 9 Chapter 1...
Page 16: ...16 Assembly for Steps 9 16 Chapter 2...
Page 22: ...22 Assembly for Steps 17 22 Chapter 3...
Page 28: ...28 Assembly for Steps 23 26 Chapter 4...
Page 33: ...33 Assembly for Steps 28 46 Chapter 5...
Page 44: ...44 Assembly for Steps 47 54 Chapter 6...
Page 49: ...49 STEP 52 Tower harnesses Insert cables from each tower assembly into the bottom holes B...
Page 53: ...53 Assembly for Steps 55 58 Chapter 7 HARDWARE NEEDED AA0655 8 X 3 4 Square pan head QTY6...
Page 54: ...54 Parts Needed Pallet 2 loose 2F...
Page 58: ...58 Chapter 8 Assembly for Steps 59 72...
Page 84: ...84 Tower Covers Part Numbers...
Page 85: ...85 DECAL PART NUMBERS...
Page 91: ...91 DB3277X ball gate Assembly NS1022 P802 black NS1022 P509 blue ZS2015X Actuator...