by us) is of about 4 mm for a normal ice cube.

7)  Check an ice production cycle ensuring that the cube

plate is conveyed into the storage bin and that all
operations are performed regulary.

8) 

Verify the working of the machine-stopping
microswitch by keeping the splash-guard deflector
oper for over 30 seconds.

9) Put on the panels you have removed before.
10) The front panel is equipped with 5 “LEDs” nexi to the

symbols corresponding to the following functions:

ATTENTION
The machine is equipped with a maximum pressure
switch with manual reset.
Red pilot light lit LED 1: alarm due to a raised
condensation pressutr, the machine stops.

FUNCTIONING:
The ice cubes are produced within a special hive-like
vertical copper evaporator.
A circulation pump produces a continuous water flow on
the gront grid; gradually, a portion of the water turns into
ice on the inner walls of the small cells and forms cubes,
the height of which is controlled by a special adjustable
sesnor. Such a sensor is made us of two metal reeds,
which are fed by a low-voltage circuit, (insulated between
themselves), and kept at a certain distance (adjustable
through a screw) from the evaporator. As the ice is
produced, the water film flowing on the ice itself
approaches the two reeds finally touches them, thus
closing the electronic circuits whitch causes at the same
time:
-

The sending of warm gas to the evaporator, by
opening a solenoid valve, anc the consiquent
disjunction of the cube plate from the evaporator.

-

The opening of the water-discharge valve in order to
remove any possible residual impurity.

Once it has been disjuncted, the cube plate slides away
from the evaporator and moves the front baffle (which is
hinged in its upper portion) toward the outside andm with
simple gravity, falls into the container,
The front baffle, while rotating back and forth, opens and
closes the contacts to an elecrronic card, which, in turnm
restores the normal ice-production cycle.
When the container is full, the last ice-cube plate keeps
the baffle open and, therefore, the microswitch contacts
do not close. Thus, the electronic card, connected to the
microswitch, stops the machine within 30 seconds.
The removal of the ice from the collecting bos allows the
baffle to restore its normal position, and therefore the
producer is started again.
A complete cycle takes from 15 to 30 minutes,
depending on water and room temperature.In case of
machine stopping because of irregular working,the LED
nr. 4 lights up. Wait at least 3 minutes from the alarm

beginning, before prewssing reset. If the stopping
happens again, consult the technical assistence.

CLEANING AND MAINTENANCE

NOTE:
Observe safety practice: disconnect the machine from
electricity supply before cleaning and mainance
operations.

CLEANING OF THE AIR CONDENSER

The gradual accomulation of dust in the condenser causes
a significant reduction in the refrigerating action of the
machine and consequently in its ice production. It is
recommended to inspect frequently the condenser in the
back of the machine and to clean in either withanon-
metallic brush, or better with a vacuum cleaner (pict. nr. 23).

CLEANING OF WATER INFLET FILTER

Close the shut-off valve of the water supply, take out the
water inlet probe filter and rinse the filtering part under a
water flush and reassemble.

CLEANING OF THE CABINET ESTERIOR
Clean using a clean cloth and warm water.

CLEANING OF THE AIR STORAGE BIN
Remove the ice from the storage bin. Clean the interior
with a sponge wetted in warm water with a little sodium
bicarbonate: rinse with clean water and dry throughtly.

CLEANING OF THE WATER CIRCUIT

ATTENTION
The machine is equipped with a new semi-automatic
washing device that enables the effective cleaning of the
entire hydraulich system.
The washing operation should be carried out by a service
technician.
The washing frequency depends upon the hardness of
the water. It is advised that the washing opeation is
carried our at least twice a year.

9

HIGH

PRESS

FULL

1

2

3

4

5

B

UNDER UNFAVORABLE ELECTRICAL POWER
SUPPLY THE MACHINE CAN GIVE A DROPING
TENSION WITH TRANSIENT STATE.

LED Nr. 1 
Alarm high pressure.
LED Nr. 2
Alarm.
LED Nr. 3
Tank full./Washing.

LED Nr. 4
Operation. 
LED Nr. 5
Electrical power supply.
BUTTON B 
Reset/Washing.

Summary of Contents for N 132M

Page 1: ...EL USO MANUAL DE USO BRUKSANVISNING BRUKSANVISNING BRUGSANVISNING K TT HJE O H IE XPH E FABBRICATORI DI GHIACCIO ICEMAKING MACHINES EISMASCHINEN PRODUCTEURS DE GLACE IJSPRODUCERS FABRICADORES DE HIEL...

Page 2: ......

Page 3: ...larme LED N 3 Deposito pieno LED N 4 Funzionamento LED N 5 Rete PULSANTE B ROSSO Reset Lavaggio LED Nr 1 Alarm high pressure LED Nr 2 Alarm LED Nr 3 Tank full Washing LED Nr 4 Operation LED Nr 5 Elect...

Page 4: ...TENTATO 1 ALLACCIAMENTI ELETTRICI 2 ALLACCIAMENTI IDRICI 3 INSTALLAZIONE DELLA MACCHINA 4 COLLAUDO DELLA MACCHINA 5 INTERVENTI DI RIPARAZIONE SU TUTTI I COMPONENTI E ORGANI DELLA MACCHINA 6 SMONTAGGIO...

Page 5: ...i collegare la macchina elettricamente accer tarsi che il voltaggio di rete corrisponda a quello indi cato sulla targhetta posta sul retro della macchina fig n 5 13 Installazione deflettore aria in do...

Page 6: ...gato ad una scheda elettronica che ripristina il ciclo normale di produzione del ghiaccio Quando il conteni tore sar pieno l ultima piastra di ghiaccio tiene il deflet tore aperto e quindi i contatti...

Page 7: ...USIVE BY QUALIFIED PERSONNEL 1 ELECTRICAL CONNECTIONS 2 WATER MAINS CONNECTIONS 3 MACHINE INSTALLATION 4 MACHINE TEST RUN 5 REPAIRING MACHINE COMPONENTS AND PARTS 6 DISASSEMBLY OF MACHINE AND OR COMPO...

Page 8: ...throttled or siphoned It is advisable that the pipes discharge in an open vented drain pict nr 18 12 Connect the macchine to the electricity supply after having checked that the voltage corresponds t...

Page 9: ...d therefore the microswitch contacts do not close Thus the electronic card connected to the microswitch stops the machine within 30 seconds The removal of the ice from the collecting bos allows the ba...

Page 10: ...S QUE PAR UN INSTALLATEUR DIPLOM L RACCORDEMENTS ELECTRIQUES 2 RACCORDEMENTS A L ALIMENTATION D EAU 3 INSTALLATION DE L APPAREIL 4 ESSAI DE LA MACHINE 5 INTERVENTIONS DE R PARATION DE TOUS COMPOSANTS...

Page 11: ...me tuyauterie ne subisse aucun tranglement ou siphonnement Il convient que la tuyauterie vacue dans un siphon ouvert fig n 18 12 Avant de brancher la machine s assurer que le voltage du secteur corres...

Page 12: ...tout d abord en avant puis en arri re ouvre et ferme les contacts d un micro magn tique reli une carte lectronique qui r tablit le cycle normal de production de la glace Lorsque le contenant est plei...

Page 13: ...SSCHLIE LICH VON EINEM AUTORISIERTEN INSTALLATIONSTECHNIKER L STROMANSCHLU 2 WASSERANSCHLU 3 INSTALLATION 4 MASCHINEN TEST 5 REPARATUR ALLER TEILEN UND WERKTEILEN DER MASCHINEN 6 ABMONTIERUNG DER MASC...

Page 14: ...Netzspannung mit der am Kennschild an der Maschinenr ckseite angegebenen Spannung bereinstimmt Abb 5 13 Montage des mitgelieferten Leitblechs Abb 24 Das Leitblech muss wie dargestellt montiert werden...

Page 15: ...eschlossenen magnetischen Mikroschalters der den normalen Eisproduktionszyklus wieder startet Wenn der Beh lter voll ist h lt die letzte Eisplatte das Leitblech und somit die Mikroschalterkontakte off...

Page 16: ...ALA DOR AUTORIZADO L CONEXIONES EL CTRICAS 2 CONEXIONES HIDRICAS 3 INSTALACI N DE LA M QUINA 4 PRUEBA DE LA M QUINA 5 INTERVENCIONES DE REPARACI N EN TODOS LOS COMPONENTES Y RGANOS DE LA M QUINA 6 DES...

Page 17: ...a desag e en un sif n abierto Fig 18 12 Antes de conectar el ctricamente el aparato compruebe que el voltaje de la red coincida con el indicado en la placa de caracter sticas colocada en la parte post...

Page 18: ...el contenedor En su movimiento de rotaci n primero hacia adelante y luego hacia atr s el deflector central abre y cierra los contactos de un micro magn tico conectado a una tarjeta electr nica que res...

Page 19: ...UTORIZADO 1 LIGA ES EL CTRICAS 2 LIGA ES HIDR ULICAS 3 INSTALA O DA M QUINA 4 TESTE E APROVA O DA M QUINA 5 INTERVEN ES DE REPARA O EM TODOS OS COMPONENTES E RG OS DA MAQUINA 6 DESMONTAGEM DA M QUINA...

Page 20: ...electricamente certificarse de que a tens o de rede corresponda quela indicada na placa colocada detr s da m quina fig n 5 13 Instalaci n del deflector del aire en dotaci n Fig 24 el deflector debe in...

Page 21: ...ico ligado a uma placa electr nica que restabelece o ciclo normal de produ o de gelo Quando o recipiente est cheio a ltima chapa de gelo mant m o deflector aberto e ent o os contactos do micro abertos...

Page 22: ...HE AANSLUITINGEN 2 WATERAANSLUITINGEN 3 INSTALLATIE VAN DE MACHINE 4 TESTEN VAN DE MACHINE 5 REPARATIEWERKZAAMHEDEN AAN ALLE COMPONENTEN EN ORGANEN VAN DE MACHINE 6 DEMONTAGE VAN DE MACHINE EN OF VAN...

Page 23: ...water moeten de leidingen een minimaal afschot van 3 hebben Controleer hierbij ook dat de slangen geen knikken bobbels of deuken vertonen Het verdient aanbeveling om de afvoer via een open sifon te la...

Page 24: ...de bewaarunit De centrale deflector opent bij zijn beweging eerst naar voren en daarna naar achteren de contacten van een magnetische microschakeling die verbonden is met een elektronische chip Deze...

Page 25: ...LUKKENDE UTF RES AV EN SERTIFISERT INSTALLAT R l ELEKTRISKE KOBLINGER 2 VANNTILKOBLING 3 INSTALLASJON AV MASKIN 4 PR VEKJ RING AV MASKIN 5 REPARASJON AV MASKINKOMPONENTER OG DELER 6 DEMONTERING AV MAS...

Page 26: ...skinen fig 5 13 Installasjon av den medf lgende luftdeflektor fig 24 Deflektoren m installeres som angitt for unng at varm luft blir resirkulert i kondensatoren Den maksimale toleranse i spenningutsvi...

Page 27: ...ogs mikrokontakterne pne P denne m te kan det elektroniske kort forbundet til mikroswitchen stanse maskinen etter 30 sekunder N r isterningene fjernes fra magasinet g r deflektoren tilbake til sin no...

Page 28: ...SLUTNINGAR 2 ANSLUTNINGAR TILL HUVUDVATTENLEDNING 3 INSTALLATION AV MASKINEN 4 TEST RNING AV MASKINEN 5 REPARATION AV MASKINENS KOMPONENTER OCH DELAR 6 NEDMONTERING AV MASKINEN OCH ELLER KOMPONENTER 7...

Page 29: ...att vattnet fr n avloppsslangen t ms i en ppen h vert bild 18 12 Innan maskinen ansluts till eln tet m ste du f rs kra dig om att n tsp nningen motsvarar sp nningen som anges p m rkskylten som r place...

Page 30: ...f rst fram t och d refter bak t ppnar och sluter kontakterna p en magnetisk mikrobrytare som r ansluten till ett elektroniskt kort som terst ller det normala isproduktionsprogrammet N r beh llaren ha...

Page 31: ...JA NE SAA SUORITTAA VAIN VALTUUTETTU ASENTAJA L S HK LIIT NN T 2 VESIJOHTOLIIT NN T 3 LAITEASENNUS 4 LAITTEEN K0EK YTT 5 LAITTEEN KOMPONENTTIEN JA OSIEN KORJAUS 6 LAITTEEN JA TAI OSIEN PURKAMINEN 7 S...

Page 32: ...ennetaan est m n l mpim n ilman palaaminen j hdyttimeen J nnitteen suurin sallittu poikkeama on 6 nimel lisarvosta Koneelle on valmisteltava s hk n sy tt piiri jossa on oma kaksinapainen virtakytkin j...

Page 33: ...loin mikroon liitetty elektroni nen kortti pys ytt koneen 30 sekunnin kuluessa J n poistaminen s ili st sallii suuntauslevyn palaamisen normaaliasentoon ja tuotannon uudelleen alkamisen Kokonaisen jak...

Page 34: ...DF RES AF EN AUTORISERET INSTALL R l EL TILSLUTNING 2 VANDTILSLUTNING 3 MASKININSTALLATION 4 PR VEK RSEL AF MASKINEN 5 REPARATION AF MASKINKOMPONENTER OG DELE 6 DEMONTAGE AF MASKINE OG ELLER KOMPONENT...

Page 35: ...edf lgende luftdeflektor fig 24 Deflektoren skal monteres som angivet med henblik p at forhindre recirkulation af varm luft i kondensatoren Den maksimale tolerance i sp ndingsudsving er 6 af den nomin...

Page 36: ...dermed ogs mikrokontakterne bne P denne m de s rger det elektroniske kort forbundet til mikroswitchen for at standse maskinen efter 30 sekunder N r isterningerne fjernes fra magasinet g r deflektoren...

Page 37: ...D E S H 3 E G K A T A S T A S H T O U M H C A N H M A T O S 4 D O K I M H S E O L A T A E X A R T H M A T A K A I O P G A N A 5 EPISKEUES SE OLA TA EXAPTHMATA KAI OPGTANA T O U M H X A N H M A T O S...

Page 38: ...00 Kg 400 Kg 500 Kg VDE GS 10 1 1 2 20 3 4 13 5 1 2 16 17 6 7 8 9 10 3 4 18 11 3 18 12 5 13 24 6 3 mm 1 2 40 45 mm 3 30 4 5 6 1 19 38 GR 73 23 EMC 89 336 10 C 40 C 10 s cm 5 C 35 C 1 14 PSI 5 70 PSI 5...

Page 39: ...3 5 mm 7 8 30 9 10 5 LED 1 2 reset 30 15 30 LED 2 3 Reset 30 23 39 HIGH PRESS FULL LED N 1 LED N 2 LED N 3 LED N 4 LED N 5 Reset B 1 2 3 4 5...

Page 40: ...40 Notes...

Page 41: ...ICE MAKER SERVICE Place Stamp Here Affrancare Via del Lavoro 9 31033 Castelfranco Veneto Treviso Italy SERVICE NOTES NOTES D ENTRETIEN NOTE DI SERVIZIO DATE REF...

Page 42: ...sine pour la protection de votre machine Bitte schicken diese Karte an die Fabrik zur ck um Ihre Machine zu sch tzen Warranty Registration Card Cartolina di Registrazione Garanzia Fiche enregistrement...

Page 43: ......

Page 44: ...Via del Lavoro 9 C P 172 I 31033 Castelfranco Veneto TV Italy Tel 39 0423 738455 Fax 39 0423 722811 E mail service castelmac it Web site www castelmac it Cod 71503450 0 rev 003...

Reviews: