Sequence of Operation
W
U
-010
0
Initial start-up or start-up after automatic shut-off
1. Pressure Equalization
Before the compressor starts the hot gas valve is energized
for 15 seconds to equalize pressures during the initial
refrigeration system start-up.
2. Refrigeration System Start-up
The compressor is energized after the 15-second pressure
equalization, and remains on throughout the entire Freeze
and Harvest Sequences. The hot gas valve remains on for 5
seconds during initial compressor start-up and then shuts
off. At the same time the compressor starts, the
condenser fan motor is energized throughout the entire
Freeze Sequence.
3. Prechill
The compressor is on for 30 seconds prior to water flow to
prechill the evaporator.
4. Freeze
The water pump starts after the 30-second prechill. An
even flow of water is directed across the evaporator and
into each cube cell, where it freezes. When sufficient ice
has formed, water contacts the ice thickness probe. After
approximately 5 seconds of continual water contact, the
Harvest Sequence is initiated.
68
Summary of Contents for IC-0170A
Page 1: ...Undercounter Ice Machines Technician s Handbook Revision Date 1 24 22...
Page 2: ......
Page 14: ...THIS PAGE INTENTIONALLY LEFT BLANK...
Page 17: ...16 How to Read a Serial Number Full Serial Number...
Page 154: ...WU 0100 WIRING DIAGRAM Self Contained Air cooled 153...
Page 155: ...IC 0170 IU 0170 IC 0220 IU 0220 WIRING DIAGRAM Self Contained Air cooled 154...
Page 156: ...Printed Circuit Bards PCB WU 0100 PCB 155...
Page 161: ...SPACE FOR TECHNICIAN S NOTES...
Page 162: ...SPACE FOR TECHNICIAN S NOTES...
Page 163: ...SPACE FOR TECHNICIAN S NOTES...
Page 164: ...SPACE FOR TECHNICIAN S NOTES...
Page 165: ......