Self-Contained Recovery/Evacuation
1. Use the 'ICE/OFF/WASH' switch to turn the ice
machine off.
2. Install manifold gauges, scale and recovery unit
or two-stage vacuum pump and open high and
low side on manifold gauges.
MANIFOLD SET
OPEN
VACUUM PUMP/
RECOVERY UNIT
CLOSED
OPEN
LOW SIDE
ACCESS
VALVE
HIGH SIDE
ACCESS
VALVE
OPEN
RECOVERY/EVACUATION CONNECTIONS
3. Perform recovery or evacuation:
A. Recovery: Operate the recovery unit as
directed by the manufacturer’s instructions.
B. Evacuation prior to recharging: Pull the system
down to 500 microns. Turn off the pump and
perform a standing vacuum leak check to
ensure the micron level does not rise beyond
1,000 microns within 5 minutes.
4. Follow the Charging Procedures.
127
Summary of Contents for IM Series
Page 1: ...Revision Date 1 24 22 IM Series Air Water Remote Ice Machines Technician s Handbook ...
Page 2: ......
Page 3: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 9: ...THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 15: ...THIS PAGE INTENTIONALLY LEFT BLANK 14 ...
Page 17: ...How to Read a Serial Number Full Serial Number 16 ...
Page 35: ...THIS PAGE INTENTIONALL Y LEFT BLANK 34 ...
Page 48: ...Flexible Numeric Display FND Functions 47 ...
Page 93: ...THIS PAGE INTENTIONALLY LEFT BLANK 92 ...
Page 106: ...Testing the water level sensor Before S N Starting With VC 105 ...
Page 134: ...SERVICE REMOTE RECOVERY EVACUATION CONNECTIONS 133 ...
Page 145: ...THIS PAGE INTENTIONALLY LEFT BLANK 144 ...
Page 155: ...THIS PAGE INTENTIONALLY LEFT BLANK 154 ...
Page 157: ...Wiring Diagram 156 ...
Page 158: ...PCB Layout 157 ...
Page 159: ...PCB Dip Switches 158 ...
Page 161: ...SPACE FOR TECHNICIAN S NOTES ...
Page 162: ...SPACE FOR TECHNICIAN S NOTES ...
Page 163: ...SPACE FOR TECHNICIAN S NOTES ...
Page 164: ...SPACE FOR TECHNICIAN S NOTES ...
Page 165: ......