General information
4
WARNINGS
m
IMPORTANT
–
The instructions manual is an integral and essential part of the product. If the body is sold or transferred to a new owner
or if you relocate and leave the system, always make sure that the manual accompanies the boiler body, so that it can be
consulted by the new owner and/or by the installer. In case of damage or loss, request a copy from Technical Assistance
Service
ICI CALDAIE S.p.A.
. This body must be intended for the use it was expressly designed for. The manufacturer will be
exempted from any liability, contractual and extra-contractual, for any injury/damage caused to people, animals, or proper-
ty due to the failure to perform maintenance and/or scheduled periodic checks and improper uses.
–
Upon receipt of the generator, make sure that the supply is intact and undamaged and promptly contact
ICI CALDAIE
S.p.A.
if it does not correspond to the order
–
The installation of
SIXEN
generator must be performed by a Certified Company which, at the end of the operation, must
provide the owner with the declaration of conformity certifying that the installation has been correctly carried out, namely
in compliance with the Standards and the national and local Laws in force, and with the indications included in the instruc-
tion manuals supplied by
ICI CALDAIE S.p.A.
–
After long periods of inactivity of the device, the intervention of professionally qualified personnel is required to perform
the operations described in the relevant paragraph in order to preserve the boiler.
–
The periodic check and maintenance of the appliance is a legislative obligation. The User must have it performed by pro-
fessionally qualified personnel.
–
Make sure the safety valves properly open at the design pressure.
–
Make sure the safety pressure switch intervenes properly which, by shutting down the burner, eliminates the cause of the
pressure increase.
–
Check the correct connection of the accessories to the boiler body (gasket seal check).
–
Pay the due attention during handling and installation.
–
Periodically check the condition of the same accessories (exclusion of fractures).
–
Once installation is completed, check the intervention of the safety valve by carrying out a preventive hydraulic test (at the
PT pressure indicated on the ID plate).
–
Make sure the safety level switch is working properly, in accordance with the contents of the technical manual supplied
with the boiler.
–
It is necessary to check that the operating water conductivity values are within those provided in the supplied technical
manual.
–
Make sure the water loading pump is working properly as described in the technical manual provided with the boiler
(pump wear, hydrostatic head in suction, water supply temperature, pump connection/disconnection from the level con-
trol probes).
–
Analyse the water when necessary, ascertaining that the values are within the limits expressed in this technical manual
and carry out the due chemical treatments. Check the intervention of the safety probes by lowering the level below the
minimum required.
–
Manually check that the level switch is working properly every 6 hours.
–
Do not step on or damage the protective sheath of the cable with any other mean.
–
It is not necessary to consider the boiler connections as support points for the weight of the pipes.
–
It is good practice to provide expansion joints and appropriate supports for the pipes connecting the boiler to the system
–
Check that the panel power supply complies with the wiring diagram supplied.
–
Make sure the generator is properly earthed.
–
Check the plant’s electrical system.
–
Before opening the manhole, check that the pressure in the boiler body is equal to the atmospheric pressure (0 relative bar).
–
Before opening the door, check that the burner is off and disconnected.
–
Switch off the burner and the pump before closing the shut-off valve.
–
Avoid contact with the non-insulated parts of the equipment during its operation. When adjustments or checks are carried
out during operation, it is necessary to protect oneself with suitable clothing (P.P.E. according to Italian Legislative Decree
81/08).
Cooke Industries - Phone: +64 9 579 2185 Email: sales@cookeindustries.co.nz Web: www.cookeindustries.co.nz