CHAPTER II
INSTALLATION
This chapter covers unpacking and inspection, selecting location, installing TOPPER and
related components, connecting water inlet and electrical requirements.
UNPACKING AND INSPECTION
Upon receiving unit, immediately remove unit from shipping carton and inspect for
shipping damage.
NOTE: Before leaving the factory all TOPPER units were carefully inspected and the
carrier has accepted and signed for them. Any damage or irregularities should be noted
at the time of delivery and immediately reported to delivering carrier. Request a written
inspection report from claims inspector to substantiate any necessary claim. File claim
with delivering agency, not International Carbonic Inc.!
Unpack LOOSE-SHIPPED PARTS. At this time make sure all parts listed are present
and in good condition. If any parts are missing, notify factory.
TABLE 2-1
LOOSE - SHIPPED PARTS
Item
Part
No.
No.
Name
Qty
1
Installation/Service
Manual
1
2*
S-101
High-pressure
C02
Regulator
1
3*
S-221
Low-pressure C02 Regulator
1
4
S-1156
Drain pan TOPPER
1
5
S-105
6’ Gas Line (Inner Braid)
1
6
-----
Product Decals
1 per flavor
7*
S-208
Water Pressure Regulator
1
8*
Water filter
1
9*
S-208A
Water Pressure Regulator
1
* Optional
SELECTING LOCATION
IMPORTANT: Ambient temperature for TOPPER should not exceed 100 degrees “F”.
Operation of cooling unit in ambient above 100 degrees “F” can and will contribute to
early failure of condensing unit and poor quality of finished product.
2-1