CHECKING WATER BATH
Periodically check water level in water bath. If it is low more water should be added as
instructed for maximum product cooling. This dehydration will normally not occur in
normal temperate climate zones. With normal humidity the opposite will occur therefore
a condensate drain is installed. Any extra water in the water bath will exit the unit via the
drain outlet. When unit is building it's first ice bank it is normal to have water overflow the
into the drain hose.
CHANGING WATER BATH
Drain water bath a minimum of twice a year. This can be accomplished by siphoning
water with short hose into bucket or removing over flow standpipe. Once water is drained
and ice bank is melted, water bath, water coils, bath walls, tank, etc. should be cleaned.
Fill water bath to the top of the standpipe, (S-778).
ADJUSTMENTS
Periodically C02 regulators should be checked for proper pressure settings and if
necessary, adjust as instructed. These settings can be recorded in NOTE section of this
manual.
ADJUSTING WATER FLOW RATE
If adjustment of water flow rate should be necessary, adjust as instructed.
ADJUSTING WATER-TO-SYRUP RATIO, “BRIX”, OF DISPENSED PRODUCT
Water-To-Syrup BRIX" of dispensed product should be checked and if necessary, adjust
as instructed.
ADJUSTING SIZE OF DRINK DISPENSED (FOR PORTION CONTROL VALVES-PCT ONLY)
Drink size of dispensed product should be checked and if necessary, adjust as instructed.
TESTING FOR LEAKS
1. Completely back off adjusting screw on low-pressure C02 regulator.
2. Close valve on top C02 cylinder.
3. Wait for 5 minutes or more. If pressure on high-pressure gauge decreases
excessively, there is leak in the carbonator circuit.
4-2