9
3.
Identify the Rear Base Crossbar (76) by the Thin
Base Pads (78) attached to its top.
Attach the Rear Base Crossbar (76) to the Left
Base Leg (73) with two M8 x 19mm Screws (8);
do not fully tighten the Screws yet.
Next, identify the Front Base Crossbar (75) and
orient it so that the “this side up” decals will face
upward when the treadmill is set upright.
Then,
attach the Front Base Crossbar with two M8 x
41mm Screws (9);
do not fully tighten the
Screws yet.
4.
Slide the Right Base Leg (74) onto the Front and
Rear Base Crossbars (75, 76).
While a second person supports the Right
Upright (70),
attach the Right Base Leg (74)
with two M8 x 19mm Screws (8), two M8 x
41mm Screws (9), and two M10 x 75mm Screws
(1) with two M10 Black Star Washers (14);
start
all of the Screws, and then tighten them.
Then, tighten the two M8 x 19mm Screws (8)
and the two M8 x 41mm Screws (9) in the Left
Base Leg (73).
5.
With the help of a second person, tip the tread-
mill upright so that the Base Legs (73, 74) are
resting on the floor.
See the inset drawing.
Identify the two Base
Leg Caps (72) and orient them as shown.
Attach the Base Leg Caps (72) with two M4.2 x
13mm Screws (5);
do not overtighten the
Screws.
3
76
74
70
73
73
74
76
73
75
8
8
9
9
78
9
9
78
75
14
72
1
72
5
5
9
9
5
8
4
74
72
5