7
STEP 3
Ⅰ.Insert the shaft (39) to the handlebar
post(2).
Ⅱ. Attach the left and right Swing tube
(6L/R) to the shaft (39) with Hex bolt (28),
spring washer (27), wave washer (23) and
Flat washer (26), But don’t tighten them
first.
Ⅲ.Attach the left pedal support tube (5L) to
the Crank (21L) with Hex bolt (28), Spring
washer (27), Spacer (22), Flat washer
(26), and Wave washer (23), don’t tighten
them first. The same way fix the Right Ped-
al tube (5R) to the Crank (21R)
Ⅳ.Connect the swing tube (6L/R) and ped-
al support tube (5L/R) with hex bolt (36),
and nylon nut (37), and then lock the hex
bolt (28) and hex bolt (36), finally, cover
the end cap (29),(30),(35),(38)
Ⅴ. Attach the Pedal (10L/R) to the Pedal
tube (5L/R) with hex bolt (34), flat washer
(32) and nylon nut (33).
STEP 4
Through the Pulse sensor wire (46) to the handle-
bar post (2) and then attach the fixed handrail (8)
to the handlebar post (2) with hex bolt (47) arc
washer(41) and Acorn nut (40).
Attach the handlebar (7L/R) to the swing tube
(6L/R) with bolt (42), Arc washer (41) and Acorn
nut (40).