TPD/VPD Series HMI Device User Manual
Copyright © 2020 ICP DAS Co., Ltd. All Rights Reserved.
Page: 61
3. Insert the panel mounting clips into the upper and lower ventilation holes.
4. Screw the panel mounting clips to the panel.
VPD-130/132/133/142/143 Series
VPD-173N/173X Series
Mounting Screw: M4 x 30L
Note:
Recommended Screw Torque: 3.4 ~ 4.5 kgf-cm.
Mounting Screw: M4 x 30L
Note:
Recommended Screw Torque: 3.4 ~ 4.5 kgf-cm.