background image

Summary of Contents for 8DNL050B12

Page 1: ...Canada Natural Gas and Propane Installation Code NSCNGPIC CSA B149 1 05 Wear safety glasses and work gloves Have fire extinguisher available during start up and adjustment procedures and service call...

Page 2: ...ture of Return Air F or C __ Rise Supply Temp Return Temp F or C __ Filter Type and Size Fan Time ON Setting Fan Time OFF Setting Manual Gas Shut Off Upstream of Furnace Drip Leg Drip Leg Upstream of...

Page 3: ...instructions Never test for gas leaks with an open flame Use a commer cially available soap solution made specifically for the detec tion of leaks to check all connections as specified in 7 Gas Supply...

Page 4: ...edy 1 2 3 4 Installation Requirements Install furnace level This furnace is NOT to be used for temporary heat of buildings or structures under construction Install furnace as centralized as practical...

Page 5: ...51 2 14 5 5 16 141 8 8DNL075B12 8DNLO75F16 191 8 175 8 73 4 1711116 8DNL1OOF14 8DNL1OOL20 241 2 23 107116 231 8 8DNL125L20 Dentoes Brand MINIMUM CLEARANCES TO COMBUSTIBLE MATERIALS FOR ALL FURNACES RE...

Page 6: ...hair Chlorinated waxes and cleaners Chlorine based swimming pool chemicals Water softening chemicals De icing salts or chemicals Carbon tetrachloride Halogen type refrigerants Cleaning solvents such a...

Page 7: ...input of all gas appliances in the space see Table 1 and b not less than the sum of the areas of all vent connectors in the space The opening shall commence within 12 of the top of the enclo sure App...

Page 8: ...assisted appliances in Btu hr ran combined input of all fan assisted appliances in Btu hr If ACH air changes per hour ACH shall not exceed 0 60 The following requirements apply to the Standard Method...

Page 9: ...ic any concealed space or floor use ONLY Type B or Type L double wall vent pipe If vent pipe passes through interior wall use Type B vent pipe with ventilated thimble ONLY Do NOT vent furnace into any...

Page 10: ...peration Use the flame of a match or candle Figure 4 8 If improper venting is observed during any of the above tests the venting system must be corrected in accordance with the National Fuel Gas Code...

Page 11: ...rnace be ing vented Follow all of the power venter manufacturer s installa tion requirements included with the power venter for venting installation vent terminal location In Canada Only power venters...

Page 12: ...ances_ lO OOOBTUH 3kW 12 30 cm for appliances 10 000 Btuh 3 kW and _ 100 000 Btuh 30 kW 36 01 cm for appliances 100 000 Btuh 30 kW 6 1 83 m 12 30 cm 3 01cm 7 2 13m AREA WHERE TERMINAL IS NOT PERMITED...

Page 13: ...to Sections 13 1 9 or 13 2 20 of the N FGC or the au thority having jurisdiction to determine whether relining is required If relining is required use a properly sized listed metal liner Type B vent...

Page 14: ...stem If the appliances are sized installed ad justed and operated properly the venting system and or the ap pliances should not suffer from condensation and corrosion The venting system and all applia...

Page 15: ...rbrick I _ withclay tile No Yes linerand top seal in good Reline lineror top seal orreline chimnei as _ IRepair metalvent fuel oil residue Mortar or Remove mortar file debris and tile debris Remove me...

Page 16: ...n Gas control valve Elbows 25 25 17 short nipples 3 Use black iron or steel pipe and fittings or other pipe approved by local code 4 Use pipe thread compound which is resistant to natural and LP gases...

Page 17: ...itional LP Piping Requirements Have a licensed LP gas dealer make all connections at storage tank and check all connections from tank to furnace If copper tubing is used it MUST comply with limitation...

Page 18: ...nnected to the control board Y to energize cooling blower speed Set thermostat heat anticipator in accordance with the Technical Support Manual Heat anticipator setting will need to be measured if 24V...

Page 19: ...Duct Design Design and install the air distribution system to comply with Air Conditioning Contractors of America manuals or other approved methods that conform to local codes and good trade practices...

Page 20: ...viewed for possible openings using light assistance or a probe can be inserted for sampling the air stream This access cover shall be attached in such a manner as to prevent air leaks Sub Bases for Co...

Page 21: ...base is equipped with locating tabs that center the base over the opening The opening in the base is 11 4 shorter and 11 8 narrower than the minimum required size of the opening in the floor This is d...

Page 22: ...r opening Slide filter into furnace until it is in position to be pushed up and over into place on the left hand side of furnace See Figure 19 Slide remaining filter into furnace and up into place on...

Page 23: ...d result in death personal injury and or property damage Turn OFF gas at shut off before connecting manometer 1 With gas OFF connect manometer to manifold pressure tap on outlet of gas control valve S...

Page 24: ...the box at the inter section of the altitude and heating value provides not only the manifold pressure but also the orifice size In the natural gas tables the factoy shipped orifice size is in bold 42...

Page 25: ...onnect wiring at gas control valve Be sure to note the proper location of all electrical wiring before being discon nected 4 Remove the four 4 screws holding the manifold and gas con trol valve to the...

Page 26: ...h the furnace as marked on the rating plate Tempera ture rise is the difference between supply and return air tempera tures To check temperature rise use the following procedure 1 Place thermometers i...

Page 27: ...ation A terminal is provided on the furnace control located in the circulat ing air blower compartment for operation of the continuous fan option This connection is intended for the low speed motor ta...

Page 28: ...demands from furnace control Fan demands from furnace control for heat cool or G will override hard wired speed tap NOTE 3 EAC is NOT active for hard wired mode but IS active for fan demands from furn...

Page 29: ...115VAC is off fuse is open Heartbeat Normal operation or no previous Diagnostic Code ON SOLID Soft Lockout Furnace Control Error 1 hr delay If code repeats immediately following power reset then repla...

Page 30: ..._ 441 01 2314 02...

Page 31: ...Future Reference Models 8DNL050B12B1 8DNL075B12B1 8DNL075F16B1 8DNL100F14B1 8DNL100L20B1 8DNL125L20B1 Denotes Brand International Comfort Products LLC Lewisburg TN 37097 Fast Parts Division 866 380 3...

Page 32: ...utlet Size Inches 4 4 4 4 4 4 Std OutletTemp F 480 480 480 480 480 480 Limits Controls Thermal Sensor F 300 300 300 300 300 300 LimitControl See PartsList See PartsList See PartsList See PartsList See...

Page 33: ...74 Denotes Brand Air Delivery in Cubic Feet per Minute C F M Furnace Rated 0 5 WC ESP TAP LOW MED L MED H HIGH _ _ 5 10 756 1012 1372 1881 30 585 888 1273 1724 No _ 50 491 780 1176 1606 u 70 387 697 1...

Page 34: ...econds cooling or heat pump 90 seconds 10 Ignition lockout will occur after four consecutive unsuccessful tdals for ignition Control will auto reset after three hours 11 Blower motor and inducer motor...

Page 35: ...II Parts for 8DNL 18 19 BB CC 6 A KK JJ O BB 16 DD AA 25 25 11 1 441 01 231402 _...

Page 36: ...t Main 18 Blower Combustion 19 Filter Air See Table below for bell Bellyband Location on Motor Model 8DNL A in O50B12B1 1 38 075B12B1 1 65 075F16B1 1 81 100F14B1 1 38 100L20B1 1 65 125L20B1 1 65 10143...

Page 37: ...Only Manifold Gas S Bracket Manifold Support T Top Burner Box U Bracket Burner Box Sides V Baffle Burner Box W Bottom Burner Box Collector Box 1013593 1013594 1014410 1172860 1012350 1013571 1013572...

Page 38: ...1013543 1013521 1013545 1013548 1013547 1013548 1013991 080B12B1 1 075B12B1 1 SDNL 075F16B1 100F14B1 1 1 100L20B1 Baffle Nox Shield Flue Pipe Pipe Flue Rack Filter Version A Rack Filter Version B Sigh...

Reviews: