Page 1: ...EAIC High Efficiency Electronic Air Cleaner Series 1014B and 1020B J anstaalation Operation o Maintenance __ o 155587 0099 D4 616 01 1003 O0...

Page 2: ...1 for use by authorized HVAC contractors only Technical Specifications 11 Installation Considerations 12 Application 12 Installation Requirements 12 Air Conditioning 12 Evaporative Hu re differs 12 At...

Page 3: ...e of the air cleaner which allows the Ionizing Collecting Cells to provide clean air for a longer period between washings_ The pre filtered air then passes through a two stage Electronic Air Cleaner I...

Page 4: ...g the option to permanently wire the unit directly to the HVAC System Control Air Flow Sensor AFS Controls the operation of the unit by sensing the movement of air within the duct This helps to reduce...

Page 5: ...he average homeowner can detect the smell of ozone concentrations as low as 25 to 100 ppb parts per billion The design of this unit has been tested and ozone production is approximately half of the pu...

Page 6: ...nside the cabinet_ 4_ 5 Locate the jumper terminal With a pair of needle nose pliers carefully relocate the jumper settings from HIGH to MED Ensure that the jumper is firmly seated in the terminal 6 R...

Page 7: ...il it appears clean and remove_ 3_ 4 5 Repeat with second cell if applicable Agitate the Pre filters up and down in the solution until they appear clean With a hose rinse the ionizing Collecting Cells...

Page 8: ...n wire from the cello 3_ Grip the new wire at each end with your thumb and index finger While stretching the wire to approximately 6 allow one end of the wire to uncoil between your thumb and index fi...

Page 9: ...from my unit Should I be concerned The zapping or popping noise that you are hearing is the sound of larger particles being vaporized by the Ionizing Collecting Cel oThis is normal and is no cause fo...

Page 10: ...ntact your local HVAC contractor for further assistance My installer told me to keep my HVAC system blower running all the time but I don t want to increase my power bilto What should I do It is recom...

Page 11: ...system blower by qualified HVAC c0nt a_0r _ Uncommon occurrence check for good common ground for air cleaner Ensure that there is a good connection between the top of the lonizing CoIlecting Cell and...

Page 12: ...D _ MODEL A B C D E F G IN MM IN MM IN MM IN MM IN MM IN MM IN MM t EAIC1020 24 _ 616 t7 _ 454 20_ 531 22_ 572 24 _ 632 7 _ 181 2t _ 545 t EAtC1014 20 4 514 13 _ 352 16 _ 429 224 572 24 _ 632 7 _t 181...

Page 13: ...y injury or damage by any person not qualified to install this product Technical Specifications Model EAICI014 Size 16x25 Part Number 120VI50 60Hz 455601 008 Part Number 240VI50 60Hz EAICI020 20x25 45...

Page 14: ...section if a transition is required between the duct work and the air cleaner The unit must be readily accessible for periodic inspection and cleaning of the Pro filters and Ionizing Collecting Cells...

Page 15: ...a forced air furnace and cooling systems Transitions If the air duct does not fit the air cleaner cabinet opening gradual transitions are recommended to reduce air turbulence through the air cleaner...

Page 16: ...ide the bottom of the cabinet This spacer is secured to the cabinet by a 6 Phillips drive screw to assure installation of the Ceils in the correct position with respect to air flow 2 Remove the screw...

Page 17: ...wboy Mounted horizontally in return plenum just above the furnace_ Counterfiow Furnace Mounted horizontally in return duct just above the furnace_ 1 Space Saver Furnace Highboy Side installation Mount...

Page 18: ...uct data label to make sure it is suitable for your application 3 Select a location for the air cleaner 4o Remove the old furnace filter and discard 5_ 6_ The air cleaner cannot remove existing dirt f...

Page 19: ...d install the screws with the screw heads inside the cabinet to prevent damage to the Air Cleaner Pre filters and optional Charcoal After Filters during removal and installation during scheduled Mount...

Page 20: ...tor Wiring to a multiple speed blower motor will damage the Air Cleaner power supply iland Void the warranty Read the instructions in the furnace installation manual carefully before attempting instal...

Page 21: ...Air Cleaner INPUT POWER From HVAC System Neither Green INPUT POWER light nor Red CELL ENERGIZED light should illuminate 4oWait approximately one minute and turn the HVAC system blower ON Most thermost...

Page 22: ...the unit is in normal operation with the HVAC system blower running Front Panes Assembly in place and ON OFF switch in the ON position and the Red CELL ENERGIZED ght is not illuminated the problem is...

Page 23: ...ntire Power Supply Assembly must be replaced The purpose of the fuse in not to protect the power supply board but to function as a troubleshooting feature of the product and to protect the transformer...

Page 24: ...ZED light and quickly identified and isolated by a simple procedure To determine if a short circuit condition exists in one or both Ionizing Collecting Cell s turn the Electronic Air Cleaner OFF Remov...

Page 25: ...t Panel Assembly from air cleaner 3_ Remove Power Tray Assembly Coven 4 Check the high voltage contact board assembly for damage or carbon tracking 5_ 6 7_ 8_ 94 Replace both Ionizing Collecting Cells...

Page 26: ...ock switch lever touch the end of the high voltage probe to either the front or rear contact board assembly The meter should read 6 2 KVDC or higher If no voltage is present check the transformer Set...

Page 27: ...24 005 123324 004 8 Cell Ionizing Collecting 2 req 441730 t01 441729 101 9 ionizing Wire Assembly 220110 020 220110 029 13 req 13 req 10 11 12 13 13a 14 is 16 Component of Power Tray Assembly Front Pa...

Page 28: ...hether new or remanufactured assume as their warranty period only the remaining time period of this warranty THE MANUFACTURERWILL NOT BE RESPONSIBLE FOR 1o Normal maintenance as outlined in the instal...