Tunnel Master® wbc Installation Guide
Page 54
Tunnel Master® wbc Installation Guide
Page 54
A
Auxiliary Input External Power
Wiring 19
Auxiliary Input Internal Voltage
Wiring- Dry Contact 18
C
Central Log Server 53
Common Relay Output
Wiring 27, 29
Communications Wiring 44
Conduit Run Guidelines 8
Connections from WBC
to the Ultrasonic Converter
Box (Power) 40
Conveyor Relay DIP Switch
Settings 23
Conveyor Relay Wiring 23, 24
D
Delayed Panic Input 15
Determine the Location 6
DIP Switch 34
DIP Switch Settings 33
E
Electrical Installation 10
Entrance Keypad 50
Entrance Keypad Comm Cable 49
Entrance Keypad DIP Switch
Settings 51
Entrance Keypad Wiring 47
Equipment Dimensions 8
H
Hardware Specs 5
I
Input Board 16
Terminal Blocks on Input Board 14
Install Entrance Keypad 46
Internal Components 11
J
Jumpers 21
Jumper Test Point Locations 30
M
Main CPU Board 12
Main CPU Board Overview 13
Main Inputs Wiring 26
Manual Bypass Operation 17
Mounting Template 7
P
Planning for Installation 6
Powering the Ultrasonic Sensor 42
Power Requirements 8
Preventative Maintenance and
Inspection 53
Pulse Switch Wiring 25
R
Relay Boards 20
Relay Board Wiring Guidelines 20
RS-485 Comm Tiers on Main CPU
Board 39
RS-485 Wiring Layout 45
S
Second Entrance Comm Cable 52
Second Entrance Keypad
Installation 52
Second Entrance Keypad
Mounting 52
Second Entrance Keypad
Wiring 52
Serial Debug Port 53
Site Grounding Considerations 9
Site Planning 6
Start/Stop Inputs Wiring 21
T
Third Party Kiosk 35
Transformer Selection 18
Troubleshooting 53
Tunnel Master® wbc AC Power
Terminations 39
U
Ultrasonic Sensor Jumper
Settings 41
Ultrasonic Sensor Power
Terminations 40
Ultrasonic Sensor Wiring 40
Ultrasonic Truck Bed Sensor 37
Ultrasonic Truck Bed Sensor
Mounting Recommendations 38
Ultrasonic Truck Bed Sensor Power
Supply Wiring 39
W
Wire Gauge and Conduit Size 9
Index