If you have any questions, please call 1-800-558-4435
ICWUSA.com, Inc.
ELITE DOUBLE ARM INSTRUCTIONS - rev 03/31/2015 pjm
ELITE DOUBLE ARM INSTRUCTIONS
Page 3 of 3
ADJUST BALL VESA
TENSION & HEIGHT
Use the slider knob
to loosen the slider to
adjust the height of the
monitor on the Paralink.
Adjust the pivot tension
of the ball by gently
and evenly tightening
or loosening the four
screws on the back of
the ball VESA.
Slider Knob
Pivot tension
adjustment
screws
ATTACH ELITE
ARM COVERS
TOP COVERS:
Attach the long arm
cover by screwing the
two 1/4” long 6-32
fl athead screws in the
center of the cover
using a Phillips head
screwdriver.
END COVERS:
Attach the
end covers by
screwing the
two 3/4” long
10-24 fl athead
screws using
a Phillips head
screwdriver.
CENTER COVER:
Attach the center
cover by screwing
the four 3/4” long
10-24 fl athead
screws using
a philips head
screwdriver.
NOTE: DO NOT UsE
POWER TOOLs TO ATTACH.
DO NOT OVER TIgHTEN.
IF COVER Is bEINg
DIsTORED, sCREW HAs
bEEN OVER-TIgHTENED.
ADJUST ROTATION LIMITS - WALL MOUNT
The rotation limits for the arm are set
by placing the stop pins in the holes
corresponding to where you want the
arm to stop. The stop pin then bumps
into the stop block on the front of the
wall mount ear, stopping the arm.
The stop pins can be removed and
set by hand.
stop
Pin
stop Pin
stop block
ADJUST PARALINK & MONITOR TILT, ROTATION
•
Gently hold sides
of monitor. Tilt and
rotate to desired
position with
ball VESA.
•
Adjust monitor depth
by loosening the
adjustment knob,
moving the Paralink
forward or back, then
re-tighting the knob.
Adjustment
Knob
•
Extend the Elite straight out as shown
before adjusting the arms’ resistance.
Be sure all equipment is mounted
on the arm before adjusting.
•
Adjust the arm closest
to the monitor fi rst. Use
the T-handle provided
to adjust the arms’
resistance.
Do noT use
PoWer TooLs To ADjusT
ADJUST ELITE ARM RESISTANCE
ADJUST HORIZONTAL TILT ANGLE
Center
screw
Set
screws
If foot of Elite is not level,
slightly loosen center screw
with provided hex key.
Tighten set screws with hex key until foot is level, then
retighten center screw. Check for level. Repeat if necessary.