If you have any questions please call Toll Free 1-800-558-4435
Page 4 of 4
T2P2020 INSTALLATION 9/8/15 pjm
t2P2020 installation
Cord Management
•
Using the Chrome 7/32 hex key
provided, disassemble arm as
shown and lay out on a flat surface.
•
Feed computer monitor cords and
any other cords through upper
arm, lower arm, wall mount and
all bearings. When feeding cords
through arms, keep them all to one
side of bolts at arm joints.
Note:
When measuring for length
of cords, be sure to allow enough
extra cord to accommodate tilt and
rotation of monitor.
•
Pass cords through slots in monitor
mount base plate and re-attach
monitor mount to front arm.
•
Once all cords have been passed
through the arms, reattach arms
in the same order as they were
disassembled using the Chrome
7/32 hex key.
•
Torque bolts down to 204 in/lbs
(17 ft/lbs).
Note:
CORDS CAN BE DAMAGED IF
JOINTS ARE ROTATED MORE THAN
360
º
.
Bearing
Bearing
ManaGE CoRDs tHRoUGH aRM
WARNING:
When disassembling the arms, the Chrome
7/32 hex key must be used. If a smaller hex key is used,
the bolt will strip.
Stop Pin
Stop Pin
Stop Pin
Rotation
Limiter Ring
aDJUst Rotation liMits
The rotation limits for the arm are
set by placing a stop pin in the
hole corresponding to where the
arm should stop. The stop pin
then bumps into the stop screw
under the arm segment, stopping
the arm. The stop pins can be
removed and set by hand.
Monitor with Paralink
keyboard tray
Monitor with Flip up
keyboard tray
Monitor only