background image

A.  Once the arm assembly is fixed to the ceiling  
 

mount and adjusted to the neutral setting,  

 

move the arm to it’s vertical position.

 

Long arm covers and end covers should 

 

be removed.

A.  Place Paralink up to base of arm and 
 

insert stud. 

B.  Place flat washer, thrust bearing assembly,  
 

second flat washer and lock washer on to stud  

 

followed by the Nylock nut.

A.  Using supplied socket wrench, spin  

 

 

Paralink assembly until nut is finger tight   

 

followed by an extra 1/4 turn.

A.  Install end cover by reversing step 1.

1

Thrust Bearing Assembly

Flat Washer

Lock Washer

Flat Washer

Nylock Nut

PARALINK TO ELITE MOUNTING INSTRUCTIONS

2

3

4

092309V1

Reviews: