Subject to technical changes | Valid from January 2021
28
TECHNOLOGY
CALEO HOT/NEUTRAL
02
2.4. Assembly and installation instructions
This chapter provides important information on the installation of the unit.
All work, installations, deliveries and services may only be carried out by specialised companies and authorised specialists. Electrical
installations may only be carried out by a specialist with the necessary knowledge. You must ensure that suitable personnel and tools
are available to prevent damage and injuries.
Check the unit for any transport damage. Note any damage that you discover on the acceptance documents from the freight forwarder
and on your form, and have this damage confirmed.
2.4.1. First steps
To enable damage that is caused during loading, transport and unloading to be traced, all units are equipped with a so-called
“Shockwatch® 2”. This tool makes it possible to determine the point of the delivery chain at which the product was damaged,
in order to clarify transport damage. Information on the ShockWatch® concept is stored in the QR code (see Chapter 4.1)
NOTE
If the damage is only discovered after unpacking, you are obliged to report it immediately in writing. It is advisable to notify your
supplier by phone in advance.
To remove the transport packaging, you require:
•
At least two persons
•
Tools:
- cordless screwdriver or Philips screwdriver
- cutting tool
Your claim to compensation for the damage will expire if transport damage is not reported in good time (in accordance with
our General Terms and Conditions of Business).
NOTE