background image

Supplied By www.heating spares.co  Tel. 0161 620 6677

British Gas RD1

 

Installation & Servicing

5

GENERAL

INTRODUCTION

The 30-100RD1 

is a range of automatically fully controlled,

wall mounted, balanced flue, fanned gas boilers.

The heat exchanger is cast iron.  The boiler casing is of white
enamelled mild steel.

The boiler casing has a removable controls support containing a
drop-down door. The boiler thermostat is located behind the drop-
down door.

The boilers are suitable for connection to pumped, open vented
and sealed central heating systems; pumped central heating
combined with pumped or gravity indirect domestic hot water
systems; gravity or pumped indirect domestic hot water supply
systems.

Note.

The 100 is not suitable for gravity circulation.

The boilers are supplied with a standard flue kit suitable for rear
or side outlet applications from 114 mm (4 1/2") to 600 mm
(23 1/2").

OPTIONAL EXTRA KITS

A Vertex Flue Kit*

For vertical flue connection

Roof Flue Kit*

-

90°

 

Flue Elbow Kit*

-

Sealed System Unit*

This fits on top of the appliance.

Extension ducts*

Up to 3m (118") -30 to 80

Turret Outlet Kit*

* Not available for 100.

The diagnostic controls within the boiler are capable of
communicating key operational data to a central computer data
processing system via the house ring main and public
telephone system known as Remote Appliance Diagnostic
System (or RADS).

RADS can identify actual failure, or predict imminent failure of
components and specify the corrective procedures to the
British Gas Service Engineer.
To enable the system to operate, a remote mounted interface
(Gateway) is required to receive and transmit data  from the
boiler.
Without this facility, the boiler operates as standard fanned
flued boiler.

Current GAS SAFETY (Installation and Use)
Regulations or rules in force.

It is law that 

all

 gas appliances are installed by a CORGI

registered installer  in accordance with the above regulations.
Failure to install appliances correctly could lead to prosecution.
It is in your own interest, and that of safety, to ensure the law is
complied with.

The installation of the boiler MUST also be in accordance with
the latest I.E.E (BS.7671) Wiring Regulations, local building
regulations, bylaws of the local water authority, the Building
Regulations and Building Standards (Scotland) and any
relevant requirements of the local authority.  Detailed
recommendations are contained in the following British
Standard Codes of Practice:

BS.6891

Low pressure installation pipes.

BS.6798

Installation of gas fired hot water boilers of rated
input not exceeding 60 kW.

BS.5449

Forced circulation hot water systems.

BS.5546

Installation of gas hot water supplies for domestic
purposes (2nd Family Gases).

BS.7593

Treatment of water in domestic hot water central
heating systems.

BS.5440.1 Flues for gas appliances of rated input not

exceeding 70 kW.

BS.5440.2 Ventilation for gas appliances of rated input not

exceeding 70 kW.

Health & Safety Document No. 635

The Electricity at Work Regulations, 1989.

Manufacturer’s notes must NOT be taken in any way as
overriding statutory obligations.

IMPORTANT.

 These appliances are certificated by the BG

Technology Certification Services for safety and performance. It
is, therefore, important that no external control devices, e.g. flue
dampers, economisers etc., are directly connected to these
appliances -unless covered by these Installation and Servicing
instructions or otherwise recommended by  British Gas Services
in writing.
If in doubt please enquire.

Any direct reconnection of a control device not approved by
British Gas Services could invalidate the Certification and the
normal appliance warranty. It could also infringe the Gas Safety
Regulations and the above regulations.

SAFE HANDLING OF SUBSTANCES

Care should be taken when handling the boiler insulation panels,
which can cause irritation to the skin. No asbestos, mercury or
CFC's are included in any part of this boiler.

LOCATION OF BOILER

The boiler must be installed on a flat and vertical  wall, capable
of adequately supporting the weight of the boiler and any
ancillary equipment.

The boiler may be fitted on a combustible wall and insulation
between the wall and the boiler is not necessary - unless
required by the local authority. 

The boiler must not be fitted

outside.

Timber Framed Buildings

If the boiler is to be fitted in a timber framed building it should be
fitted in accordance with the Institute of Gas Engineers
document  IGE.UP/7;1998.

Bathrooms

The boiler may be installed in any room or internal space,
although particular attention is drawn to the requirements of the
current I.E.E. (BS.7671) Wiring Regulations and, in Scotland,
the electrical provisions of the building regulations applicable in
Scotland with respect to the installation of the boiler in a room or
internal space containing a bath or shower.

Where a room-sealed appliance is installed in a room containing
a bath or shower then the appliance and any electrical switch or
appliance control utilising mains electricity should be so situated
that it cannot be touched by a person using the bath or shower.

Where installation will be in an unusual location, special
procedures may be necessary and BS.6798 gives detailed
guidance on this aspect.

Summary of Contents for 30 RD1

Page 1: ...ww heating spares co Tel 0161 620 6677 INSTALLATION M A N U A L British Scottish Gas RD1 the wall hung boiler Wall hung gas fired fanned flue boiler 30 100 RD1 Installers guide to central heating boil...

Page 2: ...hatever the system demands Complete range There are 7 models in the range All models include a Downward Routing Pipe Kit and an overheat thermostat Full system suitability Most models are suitable for...

Page 3: ...water head m ft 0 45 1 5 Electrical supply 230 V 50 Hz Boiler power consumption 150W Fuse rating External 3A Internal F2A to BS 4265 Water content litre gal 2 7 0 6 3 65 0 8 4 65 1 0 4 65 1 0 Dry Weig...

Page 4: ...e through orifices which in this case are concentric The fan is down stream of the combustion chamber I2H An appliance designed for use on 2nd Family gas Group H only B G Certified P I No 87 BL 27 Des...

Page 5: ...water boilers of rated input not exceeding 60 kW BS 5449 Forced circulation hot water systems BS 5546 Installation of gas hot water supplies for domestic purposes 2nd Family Gases BS 7593 Treatment o...

Page 6: ...used inside the building the space in which the boiler is to be installed must be at least wide enough to accommodate the tool c If using the Complete Sealed System Unit then refer to the instructions...

Page 7: ...mbar MUST be available at the boiler inlet with the boiler operating Installation pipes MUST be fitted in accordance with BS 6891 Pipework from the meter to the boiler MUST be of an adequate size 100...

Page 8: ...ance is installed in a room containing a bath or shower then the appliance and any electrical switch or appliance control utilising mains electricity should be so situated that it cannot be touched by...

Page 9: ...boiler A suitable pump is a domestic circulator capable of providing an 11 C 20 F temperature differential e g Grunfos UPS 15 50 or equivalent The vertical distance between the pump and feed expansio...

Page 10: ...expansion vessel must be connected at a point close to the inlet side of the pump the connecting pipe being not less than 15mm 1 2 nominal size and not incorporating valves of any sort b The vessel c...

Page 11: ...ld feed pipe from the cistern should include a non return valve and a stop valve with an automatic air vent connected between them the stop valve being located between the system and the automatic air...

Page 12: ...box 24 Pressure switch 30 Fan Note Gravity horizontal pipes should be ABOVE ceiling level and as SHORT as possible A MINIMUM inclination of 25mm per 3m run 1 per 10 is required to avoid air locks If t...

Page 13: ...nstructions Hardware Pack listed below Wall mounting template Wall mounting plate Side outlet terminal mounting plate Flue extension tube Boiler sealing ring Flue elbow Downward routing pipe kit Boile...

Page 14: ...oiler terminal box and if applicable the extension flue box es 10 PACKAGING AND CASING REMOVAL 11 DOWNWARD ROUTING PIPE KIT Product Qty Downward pipe routing bracket 2 off M8 Spacing pillar 1 off M5 S...

Page 15: ...upport bracket It is MOST IMPORTANT that the boiler is installed in a vertical position Flue length mm Accessories Product No Up to 600 B Pack 1 off 150 308 600 to 1550 B Pack 1 off D Pack 1 off 15030...

Page 16: ...brackets supplied in a separate kit must be used These brackets are secured to the wall mounting plate and it is essential to use only those holes as shown on the wall mounting template Care MUST be...

Page 17: ...rably with a 125mm 5 core boring tool ensuring that the hole is square to the wall If the hole has been accurately cut with a drill then making good the wall faces is not essential as seals are provid...

Page 18: ...ures correct alignment of the flue terminal 2 Drill 3 holes 3 2mm 1 8 dia through the outer flue duct 4 Stick the self adhesive foam strip provided in the hardware pack onto the flue immediately behin...

Page 19: ...e flue only 1 The boiler is supplied for rear outlet installation Remove the blanking plate from the direction required and use this to blank off the rear outlet Side and rear flue 2 Lift the boiler o...

Page 20: ...off see Frame 12 600 to 1550 B Pack 1 off D Pack 1 off see Frame 12 1550 to 2500 B Pack 1 off D Pack 2 off see Frame 12 2500 to 3000 B Pack 1 off D Pack 3 off see Frame 12 Note Side flue shown 26 FLUE...

Page 21: ...ed A mains supply of 230 V 50 Hz is required All external controls and wiring must be suitable for mains voltage Wiring should be in 3 core PVC insulated sheathed cable not less than 0 75mm2 24 x 0 2m...

Page 22: ...proprietary system is used follow the instructions supplied by the manufacturer Advice on required modifications to the wiring may be obtained from the component manufacturers EC1 EC2 Volt Free Conta...

Page 23: ...w w w CH2 b b r r br b pk y w w gy w or or r b b r r w w b br y y y g y g y g y g pk y w pk y r r r w 34 PICTORIAL WIRING LEGEND b blue bk black br brown r red y yellow w white or orange v violet pk p...

Page 24: ...wiring 2 For numbering of terminals on thermostats see the manufacturer s literature 3 This is a fully controlled system set the boiler thermostat to maximum 4 Switchmaster Smiths valves are similar b...

Page 25: ...ole frost thermostat which should suffice for all systems which do not use the OFF terminals of the programmer Diagram B shows a change over frost stat which will cover most systems which do use CH OF...

Page 26: ...a a flexible tube 5 Swing the control box back into its working position 6 Switch the electricity supply ON and check that all external controls are calling for heat 7 Press the boiler reset switch H...

Page 27: ...ler you may wish to undertake the service contract yourself or alternatively offer to the customer the benefits of the British Gas Services details of which are outlined in the household pack supplied...

Page 28: ...ner support strap to the combustion chamber Remove the M5 pozi situated at the LH bottom rear of the burner and pull the burner downwards to disengage the retention tab Remove the burner to a safe pla...

Page 29: ...to the fan Disconnect the connector from the fan and slide into the flue 4b Side or top flue Slacken off two M4 screws securing the flue elbow and flue connector Disconnect the flue connector from the...

Page 30: ...checking the injector as detailed in Frame 48 and ensuring that there is an inlet pressure of 20 mbar available the pilot does not light then contact British Gas Services Relight in accordance with In...

Page 31: ...trical leads from the rear of the switch 12 Press in the 2 side retaining clips and remove the switch 13 Replace and re assemble in reverse order 14 Check the operation of the boiler 54 CONTROL POTENT...

Page 32: ...etention tab and remove the burner 4 At this stage the main burner injector can be removed checked cleaned or replaced as required Ensure that an approved jointing compound is used sparingly 5 Fit the...

Page 33: ...he mounting posts and withdraw from the control box 6 Fit the new PCB and re assemble in reverse order 7 Check the operation of the boiler Fuse To change the fuse prise the top off the holder and dise...

Page 34: ...sembly Refer to Frame 46 3 Drain the system 4 Disconnect the water connections If compression fittings are used then cut the pipes both above and below the fittings in order to allow the heat exchange...

Page 35: ...fan Is fault corrected YES NO Change pressure switch Is fault corrected Is the boiler casing correctly fitted Does the main burner light NO YES YES Does the hot surface ignitor turn off NO Is there a...

Page 36: ...ot burner injector HONEYWELL 4580 1075002 30 80 1 004982 386 131 Pilot burner injector HONEYWELL 4580 1075001 100 1 004 981 15 308 358 Pilot burner head Q359A with 308 358 Honeywell 4580 1075002 injec...

Page 37: ...rvicing 37 SHORT LIST OF PARTS LEGEND Numbers up to 51 relate to the B G spares list 10 Burner manifold 11 Air box and pilot assembly 12 Main burner 13 Main burner injector 16 Pilot shield 17 Gas cont...

Page 38: ...Installation Servicing Cla 1801 58A 26 21A LED 1 LED 2 LED 3 LED 4 23A Fuse SHORT LIST OF PARTS LEGEND 19 Control box 21A Thermostat potentiometer 26 Thermostat knob 23A Printed circuit board 58A Lock...

Page 39: ...Supplied By www heating spares co Tel 0161 620 6677 British Gas RD1 Installation Servicing 39...

Page 40: ...1994 Quality System accepted by BSI British Gas Services Limited Registered in England No 3141243 Registered Office Charter Court 50 Windsor Road Slough Berkshire SL1 2HA British Gas Services Ltd has...

Reviews: