Buccaneer GT Range
- Installation
21
ASSEMBLY
1
3
Assembly of the base
Place a sheet of paper in front of the boiler body, lift it from its
palette and stand it up on the burner.
Attach the base to the feet of the boiler and clip it onto the rear
section.
8199-EN-81
8199-EN-82
Changing the direction of opening of the burner door.
Take off the cast iron hinge section of the burner door by
unscrewing the 2 screws A (HM8 x 12) and the upper and
lower hinges by unscrewing the 2 nuts B (HM8)
Re-assemble the hinges and the hinge on the left using nuts C
and screws D supplied in the casing.
Replace the 2 screws A on the right.
2
8199-EN-29
Drain/waste tube assembly
Screw the drain tube onto the rear section. Ensure a seal by
using hemp or a sealing compound.
Place the boiler body back on its feet.