INSTALLATION
8
Buccaneer GT Range
- Installation
Dimensional information required for the connection
Connection
The boiler must be installed according to the profession with
an airtight pipe in a material that is resistant to hot gases
from the combustion and possible acid condensations. This
pipe will be as short as possible, remove and without any
sudden change in its section.
Flue Outlet
mm
Buccaneer GT 3
125
Buccaneer GT 4
125
Buccaneer GT 5
125
6
BURNER CONNECTION
The gas supply MUST be sized in accordance with British
Gas recommendations and be fabricated in compliance with
CP. 331 Pt. 3 and any Local Gas Board installation
standards.
The Local Gas Board should be contacted, at a stage prior to
actual installation, for any advice or information required.
Details and advice, relating to the use of L.P.G. for firing the
BUCCANEER GT range of heating boilers, are available on
request to Caradon Ideal Ltd
GAS SUPPLY
OIL STORAGE TANK
The oil storage tank, oil supply pipe and connections to the
burner unit MUST comply with the requirements of BS. 779
and CP. 5410.
The installation should conform to the recognised standards
of good practice in the trade and comply with the relevant
Codes of Practice, Building Regulations and Local Authority,
Fire and Insurance requirements.
Piercing Ø of the burner door