11
Buccaneer GTE -
Installation & Servicing
INSTALLATION
10 PACKAGING
The following table shows the box numbers included with the boiler to be installed.
The assembly of any options delivered with the boiler is described in the instructions accompanying the options.
A DHW Sensor Kit (AD 212) is available for use with the Buccaneer GTE range.
11 BOILER BODY PREPARATION
Put a protective piece of cardboard on the floor in front of the boiler body. Take the body off the pallet and put it down vertically on
the burner door.
Boiler
GTE 4
GTE 5
GTE 6
Boiler
FM 2
body
FM 3
FM 4
Jacket
+
FM 11
insulation
FM 12
FM 13
Control panel
FM 126
FM 126
FM 126
buc7937
buc5
4
97
INST
ALLA
TION
Summary of Contents for Buccaneer GTE 5
Page 1: ......
Page 38: ...38 Buccaneer GTE Installation Servicing NOTES...
Page 39: ...39 Buccaneer GTE Installation Servicing NOTES...