14
Buccaneer GTE -
Installation & Servicing
INSTALLATION
16 SECURING THE INSULATION
3
2
1
buc5504
1.
Secure the insulation using the strap(s)
(1), and the attachment buckle (2).
2.
Put the back insulation into place and fix
it onto the previously installed insulation
using the fasteners (3) by folding.
17 INSTALLING THE CONTROL PANEL SUPPORT CROSS BAR
Put the support cross bar into
place on the boiler body,
positioning it on:
1.
The M8 studs at the front.
2.
The assembly rod.
3.
The rear section positioning
pin.
4.
Fix it at the front with two M8
flanged nuts.
5.
Fix the rear section with one
M8 x 30 screw and flanged
nut on one side and one
flanged nut on the
assembly rod at the other
side.
Put the rear cross bar into place on
the lugs of the rear section facing
the outside of the boiler positioning
it on:
1.
The assembly Rod.
2.
The rear section positioning pin.
3.
Fix the rear section with one M8
x 30 screw and flanged nut on
one side and one flanged nut on
the assembly rod at the other
side.
1
4
5
3
2
1
4
buc5528
F l a n g e d
N u t
3
1
2
buc5529
F l a n g e d
N u t
18 ASSEMBLING THE REAR CROSS BAR
INST
ALLA
TION
Summary of Contents for Buccaneer GTE 5
Page 1: ......
Page 38: ...38 Buccaneer GTE Installation Servicing NOTES...
Page 39: ...39 Buccaneer GTE Installation Servicing NOTES...