12
Classic FF -
Propane Installation
INSTALLATION
The boiler is supplied fully assembled in
Pack A,
together with a
standard flue assembly for lengths up to 600mm (23
1/2
"), rear
or side flue outlet, in
Pack B.
Optional extras, if ordered (Downward Piping Kit, Programmer
Kit, complete Sealed System Unit, Extension Duct Kit D, Vertex
Flue Kit G, Roof Flue Kit H and 90° Flue Elbow Kit F) are
available in separate boxes.
Unpack and check the contents.
Pack B Contents
z
Duct cutting support, 1 off
(cardboard )
z
Terminal wall plate, 1 off.
z
Terminal grille assy, 1 off.
z
Polyurethane foam seal 400 lg., 1 off.
z
No. 8 x 8 lg. Pozi pan hd. screws, 3 off.
8
UNPACKING
Pack A Contents
z
The complete boiler
z
Installation & Servicing Instructions
z
User's Instructions
z
Hardware Pack (listed below)
z
Wall mounting template
z
Wall mounting plate
z
Side outlet terminal mounting plate
z
Flue extension tube, 1 off
z
Boiler sealing ring, 1 off
Wall mounting plate
Hardware Pack Contents
z
50mm x No. 14 wood screw, 4 off
z
50mm x No. 10 wood screw, 8 off
z
Wall plug , 12 off
z
Data badge indicator arrow, 1 off
z
M8 washer, 1 off
z
22mm x 28mm copper reducing socket
(FF 275 P ONLY), 2 off
z
M5 wing nut, 3 off
z
Sealing plate, 1 off
z
M8 x 12 lg. screw, 1 off
INST
ALLA
TION