Classic FF 340 - 360 LF -
Installation & Servicing
17
INSTALLATION
REAR FLUE OUTLET
1. Pull the flue through the wall mounting plate and
locate the 3 studs in the holes in the back panel.
2. Secure the flue to the boiler using the three M5
wing nuts provided.
3. Pull the flue extension tube and engage onto the
fan. Locate and secure with the M4 screw
attached to the fan.
Note.
The sealing ring studs will locate in the back panel
one way only. This will ensure that the terminal grille
is correctly aligned.
19 MOUNTING THE BOILER
Note.
Have ready to hand the M8 screw,
washer and rectangular plate supplied in the
hardware pack. For downward routing of
pipes the M5 spacer (supplied in the
Downward Piping Kit) should now be fitted to
the back of the boiler.
1. Lift the boiler onto the wall mounting plate
hooks as shown.
Do not use the burner / controls for
lifting
2. Fit the M8 screw, washer and rectangular
plate to retain the boiler.
Note.
Before fully tightening the M8 screw, check
the boiler alignment, using a spirit level, and
adjust as necessary with the jacking screw.
20 CONNECTING THE FLUE TO THE BOILER
This plate allows neat concealment and full compression of the
rubber seal. Its use is not essential if the flue hole and flue ducts
have been accurately cut and the outside wall face is flat.
1. Position the terminal wall plate over the terminal.
2. Mark and drill 4 fixing holes with an 7mm (
9/32
") masonry drill.
3. Insert the 4 plastic plugs provided.
4. Secure the plate with 4 of the No.10 x 2" screws provided.
Note.
If the terminal is less than 2m (6' 6") above ground level,
an approved terminal guard should be fitted. Refer to the
Contents List on Page 3.
21 TERMINAL WALL PLATE
Summary of Contents for Classic FF 340 LF
Page 1: ......