15
Henrad SE FF
- Installation
FLUE KITS
Pack B2 - supplied as standard
Extension duct (1m) - optional extension
kit for side flue or rear flue outlet.
Refer to 'Flue Extension Ducts'
Note
The flue duct MUST be inclined at 2.5
0
to
the horizontal to allow condensate to drain
back into the boiler and out through the
condensate drain.
13 BOTTOM PANEL REMOVAL
INST
ALLA
TION
IMPORTANT.
The boiler MUST be installed in a vertical position
INSTALLATION
Dimension X - Wall thickness
Dimension Y - Wall thickness plus
boiler spacing (RHS)
Dimension Z - Wall thickness plus
boiler spacing (LHS)
1. Undo the 3 retaining screws.
2. Push the panel backward then to the right to withdraw it
from the boiler.
3. Unpack the boiler flue kit (and extension packs, if used).
14 DETERMINING THE FLUE LENGTH AND FLUE PACKS REQUIRED
Flue length dimension
Flue
Rear flue
Right hand side Left hand side
packs
dimn. X
flue dimn. Y
flue dimn. Z
required
114 - 580 mm
114 - 460 mm
114 - 550 mm
Pack B2, cut down
(4
1/2
- 22
3/4
")
(4
1/2
- 18" )
(4
1/2
- 21
1/2
" )
as in Frames 18 & 26
580 - 1530 mm
460 - 1410 mm
550 - 1500 mm
Pack B2 - 1 off
(22
3/4
- 60
1/4
")
(18 - 55
1/2
")
(21
1/2
- 59")
Extn. Duct - 1 off
1530 - 2480 mm
1410 - 2380 mm
1500 - 2450 mm
Pack B2 - 1 off
(60
1/4
- 97
3/4
")
(55
1/2
- 93")
(59 - 96
1/2
")
Extn. Duct - 2 off
2480 - 3000 mm
2360 - 3000 mm
2450 - 3000 mm
Pack B2 - 1 off
(97
3/4
- 118")
(93 - 118")
(96
1/2
- 118")
Extn. Duct - 3 off
Summary of Contents for Henrad SE 30 FF
Page 1: ......